Sunday, March 31, 2024

(NS+WE)/NKP(W&LE) Bridge over Maumee River in Toledo, OH

(Archived Bridge HunterHistoric Bridges; Satellite)

"Pin-connected Pratt through truss bridge over Maumee River on Wheeling & Lake Erie RR" [Lucas County index for BridgeHunter]

The bridge is "1,315.0 Feet (400.8 Meters)" long and has a main span of "345.0 Feet (105.2 Meters)." [HistoricBridges]

It is surrounded by industry on both shores so I can't get a decent street view of it.
Street View, Jul 2023

C Hanchey FlickrLicense: Creative Commons Attribution-NonCommercial (CC BY-NC) 

C Hanchey FlickrLicense: Creative Commons Attribution-NonCommercial (CC BY-NC) 

C Hanchey FlickrLicense: Creative Commons Attribution-NonCommercial (CC BY-NC) 

C Hanchey FlickrLicense: Creative Commons Attribution-NonCommercial (CC BY-NC) 

This is the post that motivated researching this bridge because this is the bridge that is in the background.
Craig Hensley Photography posted
Scenes from the Railroad
The Ironville Rail and Transfer loop sits on a 70 acre lot along the Maumee River in Toledo, OH. With over 28,000 feet of rail which is serviced by in-house locomotives. Onsite there are liquid bulk transloading racks and pumps to move material directly from rail to truck and vice-versa. There is also a self-unloader receiving hopper and conveyor system that can receive bulk products directly from vessels at 2,000 NT per hour. 
Toledo, OH - Octobert 2023

Saturday, March 30, 2024

Barge allides with US-59 Bridge over Arkansas River south of Sallisaw, OK

(no Bridge Hunter; no Historic Bridges; Satellite)

These "fender benders" are not rare. I think we are seeing them now because the Baltimore accident has taught the YouTube algorithm to suggest allisions with bridges.

0:27 video @ 0:04

All lanes were closed just before 1:30pm, Mar 30, 2024, after a barge struck it. It reopened about two hours later. [koco]
Oklahoma Highway Patrol posted eight photos with the comment: "US-59 south of Sallisaw at the Kerr Reservoir is completely shut down at this time due to a barge that has struck the bridge. Troopers are diverting traffic away from the area. The bridge is going to be shut down until inspections of the bridge can be made."
1

2

It looks like a liquid product barge. Is it empty or does it have enough hulls to hold the product?
3

4

5

6

7

8

0:47 video of a news report

Friday, March 29, 2024

1953 Isabella Dam on Kern River northeast of Bakersfield, CA

(Satellite)

Steve Schott, Oct 2023

The USACE finished a 17-year upgrade project in 2023. It was delivered underbudge at $320m.
4:15 video @ 0:38

@ 1:22

The new spillway being constructed.
hdrinc

This article provides a cost figure of $600m.
enr, paywall, Photo courtesy of USACE
"The Isabella Lake Dam safety modification project will address overtopping, seismic and seepage issues identified with Isabella Lake’s main and auxiliary dams to reduce the likelihood of dam failure."

2:25 video @ 1:42

Before this project was done, the reservoir was kept below 2/3 of its originally designed capacity. [wakc]

Thursday, March 28, 2024

1941 Prado Dam on Santa Ana River near Corona, CA

(Satellite)

The wet Winter that California has experienced in 2024 is putting some of the dams in the news because they are spilling water. That provides better visuals than I can find on the USACE websites.

We see water flowing in the outlet works. The concrete apron to the right of the outlet is the spillway. [USACE_project]

2:19 video @ 0:20

@ 1:24
The USACE is spending 100s of millions of dollars to improve the dam. This includes increasing the height of the dam & levees and a larger outlet works.

In addition to flood control, the reservoir helps replenish the groundwater, and it provides a wildlife refuge.

I used Google Earth to see what the reservoir looks like in a dryer year. It is a good thing that the purpose of the reservoir is flood control and not water supply because it gets rather empty.
Google Earth, Dec 2020


Wednesday, March 27, 2024

1954 Lopez Dam on Arroyo Grande Creek near Arroyo Grande, CA

(Satellite)

Mar 27, 2024, at 5am the water started spilling for the first time in 25 years. Just last December, the lake was down to 22% of capacity.
3:29 video @ 0:30

@ 1:52

Street View, Feb 2008

An inspection of the spillway was ordered in 2017. Hopefully, any probems that were found have been fixed. [CalCoastNews]

I have not been able to find a good overview photo of the dam and its spillway. So I'll go with a satelite image.
Google Earth, Jan 2023

I hope the USACE maintins the dam better than they do their website. The "Dam & Reservoir Data" link on their Lopez webpage returns an error. The dam was built in 1955.

Tuesday, March 26, 2024

1977-2024 I-695 Lost Francis Scott Key Bridge over Patapsco River at Baltimore, MD

(Archived Bridge Hunter; no Historic Bridges; B&T; B&T about the collapseSatellite)

A ship alliding with this bridge and causing a catastrophic failure has upped my priority on documenting it. The bridge WAS 1.6miles (2.6km) long. Bridge Hunter calls it an arch bridge. But I agree with another source that calls it a continuous truss. The main span was 1,200' long (366m). It was the third longest main span of a continuous truss bridge in the world. [7:21 video @ 1:16]

6:39 video @ 5:24

@ 5:28

A before photo for context:
Jeremy Smith via BridgeHunter, License: Creative Commons Attribution-Share-Alike (CC BY-SA)

Rescuers pulled out two survivors, one in a “very serious condition” and the other uninjured, and were searching for more in the Patapsco River after huge spans of the 2.6km Francis Scott Key Bridge crumpled into the water. Eight people were on the bridge at the time of the collision and six remain unaccounted for, said Maryland’s transportation secretary....“The vessel notified Maryland Department of Transportation that they had lost control of the vessel and a collision with the bridge was possible,” the Cybersecurity and Infrastructure Security Agency was quoted saying. “The vessel struck the bridge causing a complete collapse.”...The US Coast Guard reported the collapse at 1.27am [Mar 26, 2024]....Work crews had been on the bridge at the time of the collapse and sonar detected vehicles under the water, which was about 15m deep at that point, said Maryland Secretary of Transportation Paul Wiedefeld....The ship issued a Mayday call moments before the collision, a move which saved lives as officials halted some road traffic, he said....The port handles the most car imports and is among the largest for coal exports....It is one of three ways to cross the Baltimore Harbor, with a traffic volume of 31,000 cars per day....More than 40 ships remained inside Baltimore port, including small cargo ships, tugboats and pleasure craft, data from ship-tracking and maritime analytics provider MarineTraffic showed. At least 30 other ships had signaled that their destination was Baltimore, the data showed.
Bridges Now and Then posted
A sad day in Baltimore, hoping for the best for the 6 missing bridge workers. Could have been much worse, fortunately they stopped vehicle traffic in time.
"In an aerial view, the cargo ship Dali sits in the water after running into and collapsing the Francis Scott Key Bridge in Baltimore on Tuesday." (Tasos Katopodis/Getty Images)

Some drone views of the carnage.
2:55 video @ 1:24

In addition to stopping all traffic on I-695 for a long time, this also stops all shipping traffic. Trucks carrying hazardous material used this bridge because they are not allowed to use the tunnels that cross the harbor. I noted above that 40 ships are trapped in the harbor and 30 ships were headed to this port. I wonder how quickly they can yank the trusses out of a channel.
 
Lola Zoe posted two photos with the comment: "Open March 1977 - collapsed March 2024. 💔😪"
[7,437 comments, I did not look past the first 50.]
1

2

A new view:
The Heat Magazine posted
Before and after 🙏🙏

The Bmore Page posted

This is a unique angle on the bridge. 
WNST.net posted
My hometown bridge is gone but this is the most beautiful image of the Key Bridge I have seen this morning. If you haven’t shed a tear this morning, you aren’t from Dundalk. I have been on the brink all morning with emotions that I didn’t think I had.
[There are some more photos in the comments.]
 
Jim Fredlund posted
"Francis Scott Key Bridge"

Historic Baltimore posted
Francis Scott Key Bridge (1977)
Photo from the Baltimore Sun

Grabbing a street view while I still can. I've noticed with some other bridges that the street views were removed once the bridge was removed.
Street View, Aug 2018

Bridges Now and Then posted
Marine traffic in 2021 under the Francis Scott Key Bridge in Baltimore. (Patrick Semansky/Associated Press)
The vessel Zhen Hua 13

Dee Johnson commented on the above post
I was there when it came

Two of the planned four heavy lift cranes arrived by Mar 29. The reporter implied that the yellow crane is rated at 1000 tons.
2:47 video @ 0:12

@ 1:26

The yellow crane is the largest crane on the east coast. I basically shoved the cursor across the rest of the video. I don't need an official to stand at a podium and tell me that the cleanup is going to be complex or that the closure of the port has a big impact on Baltimore's economy.
15:00 video @ 0:08

Two cruise ships won't be able to return people to their planned destination.
11:53 video @ 0:24

The clousre impacts the nation with respect to cars, coal and sugar. 8,000 people worked at the port.
4:24 video @ 0:35

Lucibello Heavy Equipment photography posted five photos with the comment: "As part of the Francis Scott Key Bridge removal effort @donjonmarine  has deployed the Chesapeake 1000. So for all the people wondering here’s a history of the Chesapeake 1000. This Derrick barge was originally flagged as the Sun 800. Built in 1972 the derrick portion of the barge was constructed by the American Hoist and Derrick company who would go on to become AMCLYDE. Side note this is the same company who built Weeks 526. Originally the main block was capable of picking up 800 ton at 65ft but after being upgraded the crane is now capable of 1000 tons at 63’ from the stern fendering. Now for some size context the barge has a length of 191’ and width of 101’. She weighs in at 2484 tons gross and has changed hands 3 times in her career. Sun sold her off to the Penn Ship company who renamed her to the Penn 800. Eventually Penn would upgrade the capacity to 1000 tons after experiencing some boom damage during a storm. After her time at Penn Ship she was sold to Donjon Marine who currently operates this shear leg. The severe bow list, in some of the photos, is the result of the water ballast used as counterweight."
Kevin Wright: I am wondering what the name and capacity of the Huge Barge Crane used tearing down the old bridge next to the New Coumo Bridge in NY .. I drove by there a few times and that crane was huge..
Sean McQuilken: Kevin Wright that is the Left Coast Lifter, ~1900 ton capacity. She is currently “dry stacked” in NY harbor and wouldn’t be able to respond quickly as she hasn’t worked in a number of years. [I was wondering about this crane.]
Kevin Wright: Sean McQuilken Thanks for the info.. so after working on the bridge it was dry docked and hasn’t worked since..??
Dennis DeBruler: Kevin Wright It helped rebuild an Amtrak bridge,
Gordon MacGillivray: That is the old Sun 800 barge crane from Sun Ship Chester Pa. At one time it was the largest barge crane in the world. I use to work on that crane as a Marine Rigger many years ago.SWL is 800 tons. Surprised it's still in service.
1

2

3

4

5

Brendan Ferry commented on the above post
I got to work with that rig in 2016 Perth Amboy, NJ, local 11 Ironworkers. 708 ton hanging on the hook here.

Mar 28:
Merchant Marine Updates by CompMan posted
Baltimore Bridge's Weight is Pinning Container Ship Dali to the Bottom
PUBLISHED MAR 28, 2024 3:26 PM BY THE MARITIME EXECUTIVE
In a reversal of the usual order for a major marine salvage operation, the U.S. Army Corps of Engineers (USACE) and its contractors will make the first big move in getting the wrecked container ship Dali out of Baltimore's ship channel.
Dali's bow is technically aground in the channel, said Vice Adm. Peter Gautier at a press conference Wednesday, because of the vast weight of the steel bridge span resting on top. The ship is pinned to the bottom and cannot move. There are no indications of damage below the waterline from this unusual load on the hull, but the wreckage of the span will have to be removed before the salvor - Resolve Marine - can take over and get the ship safely out of the channel. A dive inspection of the bow is scheduled for Thursday. 
The span is in the USACE's set of responsibilities, Gautier said, and the Coast Guard will be working closely with the agency and its contractors as they perform the delicate task of pulling off the steel. 
The wreckage will be transported to a scrapping site at nearby Tradepoint Atlantic, Dredging Contractors of America CEO Bill Doyle told The Maritime Executive. He could not give an exact timeline for the work's completion, but said that it would be faster than many observers might think, thanks to an abundance of available private-sector resources. 
The span is the biggest complicating factor in the salvage, but not the only one. Once it is removed, the response team will have to survey the bottom for debris and determine how entangled the vessel is with the remaining pier structure, Gautier said. There are also about a dozen containers on the bow of the ship that were damaged by the falling bridge, and two more that went into the water. 
National Transportation Safety Board chair Jennifer Homendy said Wednesday that some of the damaged boxes on the bow contained hazardous materials, and a sheen from a containerized cargo release has been observed in the water around the ship. 
The ship has about 1.5 million gallons of fuel oil and lube oil on board, but no signs of petroleum release have been spotted, Gautier said. 
compman 
source : The Maritime Executive
Sue Proskey March shared
I find the statement that the bow is grounded pretty amazing. There must not be much leeway  underneath.


I hope this news on Apr 1 of opening two auxiliary channels is not an Aprils Fools joke.
It's not. An 11'  (3.3m) channel is open on the north side. They are dredging to create a 13' (4m) channel on the south side. (It appears that the north channel just needed some marker buoys to be placed by the Coast Guard. So now I wonder why someone didn't think of this earlier.)
8:06 video @ 1:35

This was the first vessel that went through on Apr 1.
0:27 video @ 0:27


Apr 2: the second alternate channel on the south side is open. " It has a controlling depth of 14 feet, a 280-foot horizontal clearance, and a vertical clearance of 124 feet." [Apr2]

1 of 22 added by Mike Hugg Media
Due to my work schedule and upcoming travel, I’ll be posting what I can every so often regarding the recovery efforts of the Key Bridge. 
Unfortunately it won’t be as many updates as I was hoping for, but I’ll still capture what I can. 
03.31.2024
Cranes have began moving in to start removing the first pieces of steel from the collapsed bridge in an effort to open a passage for other vessels.
[The crane on the right is the Weeks 500 that I have heard about. I saw a video where a yellow boom was skewing, but I have yet to see anything lifted.]

Apr 8, 2024:
Facebook reel
[Using the 500-ton Weeks crane to remove containers strikes me as overkill. Especially since most of the containers on the bow are empty. I've seen a video that showed at least four cranes on barges. It seems like they could handle containers. I have seen some truss segments on barges, but I have yet to see a lift of a truss segment.]

So some of those cranes are helping to create liftable truss segments.
Facebook reel

Apr 11, 2024:   The second auxiliary channel is big enough that the Weeks 500-ton crane can work on the up-river side of the bridge.
8:29 video @ 4:29

This confirms that they are using the big 500-ton crane for the little container loads and a standard crane-on-a-spud-barge for the truss segments. This seems backwards to me.
18:39 video @ 11:55

They are using more of the capacity of the 500-ton crane. The radius or reach also affects the capacity of a crane, and this reach is significant. Maybe a mobile crane on a barge can't handle 3 containers at that radius.
6:58 video @ 6:00

Apr 14, 2024: finally, I've been able to see the Chesapeake 1000 in action.
Mallory Sofastaii posted three photos with the comment: "Here's the Chesapeake 1000 in action. It's the largest floating crane on the Eastern Seaboard, and it's being used to remove large pieces of the Key Bridge as crews work to open a Limited Access Channel that allows one-way ship traffic to the Port of Baltimore. Photos courtesy of the Baltimore District, U.S. Army Corps of Engineers"
1

2

3

Note the annotation that it is a 440-ton lift.
Baltimore District, U.S. Army Corps of Engineers posted two photos with the comment: "NEW TODAY [Apr 14, 2034, a Sunday]: Unified Command salvors use the crane barge Chesapeake 1000 to move a large piece of supporting steel from the collapsed #FSKBridge on Sunday. 🏗 The Chesapeake 1000 is the largest floating crane on the Eastern Seaboard, and removing these large pieces will help open a Limited Access Channel that allows one-way ship traffic to the Port of Baltimore."
1

2

1:49 video

This video catches the actual lift. I wish they would specify how much the video was sped up. 
41:44 video @ 21:26, I shoved the cursor until found this.

Apr 25, 2024: first commercial ship through the new limited-access, 35'-deep channel.
8:33 video

This video is worth noting because it shows the removal of the first truss piece off of the Dali, closeups of the bridge debris laying on the Dali, the big hydraulic claw in action and an explanation that they are going to use "precision cutting" to cut up the big truss. From context, "precision cutting" means that they are going to use a controlled demolition (explosives), but the spokesperson would not admit they are using explosives. He insisted on using "precision cutting" every time. An "energetic felling" allows them to make all the cuts at once with no workers near the truss so they don't have to worry about how things will fall after a cut is made.
11:22 video @ 4:28

Facebook Reel

Both the crane and the claw are rated for 2,000,000 pounds. The claw is the largest in North America and is named "The Gus."
Facebook Reel

This is a proposal for the new bridge that was done on speculation by a design company. I don't understand why there would be piers under the side spans that also have cable supports.
11:57 video @ 2:45

Now that they have found the sixth, and final, worker's body, they can get on with precision cutting the 4000 ton truss to get it off the Dali. He said the crane count is up to 22.
8:10 video @ 1:54

USACE source material

After some wether delays, the precision cutting of the truss happened on May 13, 2024.
9:58 video @ 6:02

15:52 video @ 7:20

10:37 video
Some different 4k video views of the controlled demolition.

This is Minorca n Mullet's own 4k camera.
10:08 video @ 8:09

On May 20, 2024, they moved the ship away from the bridge and took it to a dock.

Jun 2, 2024: they got the last truss section that was in the Federal channel pulled out of the muck in the river bottom. The section was over 500 tons.
10:55 video @ 4:39

This post is a nice update.
Merchant Marine Updates by CompMan posted two photos with the comment:
Last Bridge Section Removed Clearing Way for Reopening Baltimore Channel
PUBLISHED JUN 5, 2024 1:22 PM BY THE MARITIME EXECUTIVE
The last large sections of the collapsed Francis Scott Key Bridge have been removed from the channel in Baltimore clearing the path for the reopening of the full channel over this coming weekend. Normal navigation is expected to resume next week.
The Army Corp of Engineers reported on Tuesday, June 4, that the last of three pieces of what they called Section 4, the parts of the bridge truss that had been resting on the Dali and the area around the ship, was lifted from the water. The first of the three sections, weighing 140 tons, was lifted on May 24 and the second section weighing 470 tons was lifted on June 1.
The operation for this portion of the recovery was called “extensive” requiring approximately 200 tons to first be cut and removed before they could handle the main pieces. A spokesperson for the Army Corps explained that these sections were buried deep in the river mudline. They said the effort was more complex than initially estimated and required “shaking and hammering” to free the steel from the mud.
Using concrete breakers, underwater surveys, and oxyacetylene torches, they separated tons of concrete roadway, cable, and steel rebar from Section 4 while removing debris with clamshell dredges.
“The final truss lifts are an important next step to re-opening the full 700-foot width of the federal navigation channel,” the Army Corps noted. The sections lifted from the water have been moved to the Sparrow’s Point area, where the recycling is being staged. 
The last phase of the operation will include dredging and a final inspection of the channel to ensure that there are no remaining hazards. Some of the teams working on the operation have already been reported to be packing their gear and leaving the site. 
No official timeline was released but reports are widely saying that the last work on the federal channel will be concluded between June 8 and 10. The channel is expected to officially be reopened to its 700-foot width by Monday, June 10 from the current 400-foot limited access channel.
The Dali remains at the Seagirt Terminal although local media reports have shown images of ongoing work removing additional debris from the vessel. It is still expected that the vessel will be shifted in the coming weeks to a shipyard in the Norfolk, Virginia area.
Baltimore officials are highlighting the work will have been completed in approximately 80 days. The focus is already shifting to the replacement efforts with Maryland's Transportation Authority having issued a first request for proposals. The deadline is June 24 with media reports saying a contractor will be selected this summer, and the final design will be selected within the next year. The bridge is expected to be completed by the fall of 2028 at a cost of $1.7 billion.
compman 
source : The Maritime Executive
1

2

Jun 11, 2024:
Seatrade Maritime posted
[In the news] The full 700 foot width of the Fort McHenry Federal Channel in Baltimore has been reopened after the removal of 50,000 tons of bridge wreckage. http://ow.ly/9F7W105wlII 
"Assets involved included 18 barges, 22 tugboats, 13 floating cranes, 10 excavators, and four survey boats, said Unified Command."

Jun 24, 2024:
Kara Ke posted four photos with the comment: "Shoutout to our United States Coast Guard for traveling the entire 120 nautical mile journey to escorting the M/V Dali out to sea to Norfolk."
David Case Jr.: She isn't heading to sea. She's heading to Norfolk Va to be unloaded and repairs.
Kara Ke: David Case Jr. I’m aware. Due to interpretation, she’s out of our channel.
[A comment indicated they also sent four tugboats with it. The containers were not removed in Baltimore because it needs the weight to get under the bridges. Lots of comments about "out to sea." I looked at a map and it is true that you can get to Norfolk without leaving the Chesapeake Bay.
It is going under the Chesapeake Bay Bridges.]
1

2

3

4

WBFF FOX 45 posted
The new Francis Scott Key Bridge is expected to be longer and taller than its fallen predecessor, but not steeper.

CivilGEO Inc. Software posted
Key Bridge rebuild contract issued
Kiewit will help rebuild the fallen Baltimore span via a progressive design-build process.
The Maryland Transportation Authority Board approved a $73 million design-build contract to Kiewit Infrastructure Co. for Phase 1 of the complete design and construction of the Francis Scott Key Bridge replacement.
Image Credits: Kevin Dietsch via Getty Images

Pile Buck Magazine posted
Learning from the Baltimore Bridge Collapse