This is a longer version of the track laying that shows all of the steps including moving a stack of four panels to the front of the train.
(new window)
The videos above provide the context for this video:
David Daruszka shared [He did do a good job of chaining down his load. The chains pulled the truck over!] |
The track panel machine can also be used to remove old track.
It is hard to believe that this happened in real life. I wonder who had the correct space between the old track and the new track. That brought out the white hats (managers) to help stare at the problem.
Sedat Saygac posted Rick Beale: So much for GIS & GPS technology. Sedat Saygac shared |
This machine uses CWR (Continuous Welded Rail) instead of track panels.