Was Sir Adam Beck Power Station 1921 446mw #1, 1954 1.5gw #2 and 1956 174mw Pump Storage by Niagara River

This should have been published in the Towns and Nature blog, so it got moved there so I can more easily find it the next time I look. And so that references to these notes are to the correct blog.

If you got sent here for any of these photos, please go to "Niagara Falls, ON: Sir Adam Beck Power Station 1921 446mw #1, 1954 1.5gw #2 and 1956 174mw Pump Storage by Niagara River"



Karen Limardi posted six photos with the comment: "The Sir Adam Beck Power Station on the Canadian side from the gorge trails in Artpark this [Sep 24, 2023] afternoon."
1

2

3

4

5
[That is the Lewiston-Queenston Bridge on the right.]

6


opg, 2 of 12

opg, 5 of 12

2:34 video @ 0:56
 


Sir Adam Beck #2 was built in phases. [NiagaraFallsInfo_station2]
Generators: Units 11, 12, 13, 14, 15, 16 and 17 went into service in 1954.
Generators: Units 18, 19, 20, 21 and 22 went into service in 1955.
Generators: Units 23 and 24 went into service in 1957.
Generators: Units 25 and 26 went into service in 1958.
Sir Adam Beck #1 taught me that the date of the first phase is used to date the power station. Originally, the generators were 25hz instead of 60hz. [NiagaraFallsInfo_station1]
Generators: Units #1, #2 and # 4 went in service on 26 January 1922.
Generators: Unit #5 went into service in 1923.
Generators: Units #3, #6 and # 7 went into service in 1924.
Generators: Units # 8 and #9 went into service on December 5th 1925.
Generators: Unit #10 went into service in July of 1930.
A hydro canal was dug for #1, but #2 uses two 14m (46') tunnels to carry the water from upstream of the falls. [NiagaraFallsInfo_station2]
Satellite

I think the inlet for the tunnels are in this bay
Satellite



The third tunnel increased the capacity by 194mw. [EnergyTariffExperts]

opg_tunnel
Big Becky, the world's largest tunnel boring machine.