Saturday, October 26, 2024

Abandoned/MRL/NP 2022 Flooded Bridge over Yellowstone River near Livingston, MT

 (Archived Bridge HunterSatellite)

We already saw in Reed Point, MT, that the Yellowstone River inundated its flood plain, covered a main highway and threatened the town.

A Flickr photo showing the flood waters while the bridge was still intact.

"Built 1897, Relocated here 1918" It was damaged in the Spring of 2022 and removed in Aug 2022. The longest span in this 316' (96m) bridge was 155' (47m). [BridgeHunter]

Thomas Wentzel posted two photos with the comment: "A collapsed train bridge is shown along the Yellowstone River Wednesday, June 15, 2022, near Livingston, Mont."
1

2

A reference on BridgeHunter indicates it was this bridge by MT-89.
Street View

Street View, Oct 2021

Street View, Aug 2022

Street View, Aug 2024

The bridge was pin-connected.
Street View, Oct 2021

At least the highway bridge survived the flood.
Kyle, Nov 2022

Global Earth, Sep 2020

I am surprised that it eroded on the inside of the bend in the river. The current is normally stronger on the outside shore of a bend and that is normally where the erosion happens.
Global Earth, Jun 2022

Global Earth, Dec 2022


No comments:

Post a Comment