"Built 1924, 1938 Lift span added and bridge raised as a result of the construction of Bonneville Dam." It is 4,418.2' (1.35km, 0.8miles) long with a main span of 262.2 (80m). [BridgeHunter]
HoodRiverBridge |
Michael Goff, Jul 11, 2008 via BridgeHunter |
Chris G, Jul 2021 |
Darel Maden posted Columbia River - Hood River |
OregonLive, Ken Reaves/Oregon Department of Transportation "Hood River-White Salmon Bridge over Columbia River gets $200 million grant for replacement." [My reaction was $200m is cheap now days. And then I read:] "The bridge is expected to cost $520 million." [A half-billion is more like what I expected.] |
hrwsba "*Initial design rendering of the new bridge, not final design." |
Aug 2023: The cost estimate for the new bridge is up to $600m. [10:25 video]
No comments:
Post a Comment