![]() |
| Cool Ohio posted and Postcard via BridgeHunter Youngstown Sheet & Tube Viaduct |
![]() |
| forumurbanohio via BridgeHunter |
![]() |
| Karl Hartzell posted via Dennis DeBruler and BridgeHunter |
These are notes that I am writing to help me learn our industrial history. They are my best understanding, but that does not mean they are a correct understanding.
![]() |
| Cool Ohio posted and Postcard via BridgeHunter Youngstown Sheet & Tube Viaduct |
![]() |
| forumurbanohio via BridgeHunter |
![]() |
| Karl Hartzell posted via Dennis DeBruler and BridgeHunter |
![]() |
| Street View, Jun 2022 |
![]() |
| 2011 photo by Irma Hale via BridgeHunter_NYC |
![]() |
| 2011 photo by Irma Hale via BridgeHunter_NYC |
![]() |
| HistoricBridges_US-60 "This is a representative example of a large mid-20th century steel stringer bridge in West Virginia." |
![]() |
| a |
![]() |
| b |
![]() |
| c |
![]() |
| 1931/48 Fayetteville Quad @ 62,500 |
![]() |
| National Rail Network Map |
![]() |
| National Rail Network Map |
![]() |
| Facebook Reel |
![]() |
| Same Reel |
![]() |
| Same Reel |
![]() |
| MTA "The MTA is repairing or replacing portions of the Park Avenue Viaduct between East 115 and East 132 Streets....The Park Avenue Viaduct is the elevated steel structure that carries four Metro-North Railroad tracks along Park Avenue between E 110 St and the Harlem River Lift Bridge." |
![]() |
| Street View, Aug 2024 |
![]() |
| MTA, this webpage has some photos of the existing viaduct and some videos of the replacement activity |
![]() |
| bechtel "At the time of the rehabilitation, it carried nearly all Metro-North trains into and out of Grand Central Terminal — carrying approximately 600 trains and 160,000 passengers daily.... Modernizing the steel structure involved replacing the deck, upgrading support structures, and improving track geometry — all while keeping trains and commuters moving. With three of the four tracks remaining active during rush hour, space for construction was extremely limited. At times, it required the team to carefully coordinate the movement of 500 tons of steel in an area no larger than 4,000 square feet. Despite these constraints, Bechtel completed the six-year effort on schedule." |
![]() |
| mi-jack, there are a couple of videos on this webpage. " Working with the MTA, Halmar International used prefabricated construction and two custom 200-ton Mi-Jack RTG cranes to efficiently replace aging viaduct sections in active rail territory – resulting in Phase I finishing $93 million under budget and 21 months ahead of schedule....Spanning 1.25 miles and serving the Hudson, Harlem, and New Haven lines, the structure is a critical link for daily commuter travel – leaving no margin for extended outages or construction delays during replacement work. During Phase I, crews replaced 8,240 feet of track across 128 bridge installations, which required lifting and positioning 190,000-lb bridge sections. Mi-Jack’s custom 200-ton gantry cranes enabled crews to efficiently lift out old steel and concrete deck segments and install prefabricated replacements within tightly controlled work windows, minimizing disruption of commuter services....Measuring approximately 30’L x 50’H x 98’W, the machines required a complex erection procedure due to the need to straddle one of the busiest rail corridors in the Northeast to perform bridge replacement." |
![]() |
| mi-jack "Following the successful completion of Phase I, which replaced the viaduct from East 115th Street to East 123rd Street, Phase II is now underway. This next phase will focus on replacing the viaduct from East 127th Street to mid-block between East 131st and East 132nd Streets, with completion expected in 2027. To begin Phase II, the two Mi-Jack MJ200HD cranes had to be disassembled and relocated to East 128th Street – a complex operation requiring smaller cranes to lift and move the components. The top beams alone measure 94 feet in length and weigh approximately 83,000 pounds." |
![]() |
| ConstructionDive "The $590 million first phase, of which $500.9 million stemmed from federal funds, replaced the viaduct’s full substructure and superstructure between East 115th and East 123rd streets." [So, the estimate must have been $683 if there was a $93m savings.] |
![]() |
| stvinc |
![]() |
| Street View, Apr 2024 |
![]() |
| Facebook Reel |
![]() |
| Same Reel |
![]() |
| Same Reel |
![]() |
| Same Reel |
![]() |
| Same Reel |
![]() |
| Same Reel |
![]() |
| arcgis |
![]() |
| Same Reel |
![]() |
| Same Reel |
![]() |
| 1960/62 Harborcreek Quad @ 24,000 |
![]() |
| A.J MIC, Apr 2023 |
![]() |
| Street View, May 2025 |
![]() |
| Street View, Nov 2025 |
![]() |
| Jackson-Township historical preservation posted Photo from 1938 of a long tunnel bored through the mountain with Huntingdon County on the west side and Franklin County on the east and although completed, it was never used for the purpose for which it had been constructed many decades before. This was originally constructed for a railroad but tracks were never laid and the tunnel was converted to use as one of the original Tuscarora Tunnels for the Pennsylvania Turnpike which began construction in 1939. A surveyor in the photo is doing work for the proposed change of use from a rail tunnel to that of the Turnpike. (Photo from Steve Kemp via https://www.facebook.com/groups/208623169187266/) Robert Salinetro: I think it was built by the New York Central RR when they were trying to compete with the PRR and they were talked out of finishing the plan. The turnpike took over some of the track right of way for the initial road. [Indeed. And the Pennsy was building a railroad up the west side of the Hudson River to compete with the NYC. JP Morgan met with the railroads and talked them out of the suicidal redundancy.] |
![]() |
| 1966/69 Fannettsburg Quad @ 24,000 |
![]() |
| gftinc In the 2020s, the lanes in the 1940 eastbound bore were widened. Also, management of infiltrating water, ventilation, lighting and control electronics were improved. "A dark coating on the exterior portals, in combination with an illuminated tunnel interior, will help counteract motorists’ tendency to slow down when approaching a dark entrance, improving traffic flow through the tunnels." |
![]() |
| WoodsAirMovement The mile-long tunnel now has 12 modern axial exhaust fans. "The 6 foot [1.8m] exhaust fans are designed to extract hazardous pollution if traffic is standing still in the tunnel - or smoke in the event of a fire - quickly and efficiently to allow safe evacuation and easier access for emergency services." |
![]() |
| John W. Barriger III National Railroad Library Flickr, cropped via BridgeHunter_1856 |
![]() |
| John W. Barriger III National Railroad Library Flickr via BridgeHunter_1856 |
![]() |
| Public Domain via BridgeHunter_1856 |
![]() |
| 1904/1962 Chardon Quad @ 62,500 |
![]() |
| Public Domain via BridgeHunter_1906 |
![]() | |
|
![]() |
| Street View, May 2019 |
![]() |
| 1 [That would be US-20 in the background.] |
![]() |
| 2 |
![]() |
| 3 |
![]() |
| 4 |
![]() |
| 5 |
![]() |
| Michael Cefaratti commented on Brian's post Love my town of Painesville, Ohio |
![]() |
| news-herald |