Showing posts with label tunnel. Show all posts
Showing posts with label tunnel. Show all posts

Saturday, August 29, 2026

1957+1991 I-476 (Pennsylvania Turnpike Extension) Lehigh Tunnel and New Austrian Tunnelling Method (NATM)

North Portal: (Satellite)
South Portal: (Satellite)

North Portal:
Street View, Jul 2024

South Portal:
Street View, Jul 2024

This 4,461' (1360m) tunnel goes under the Blue Mountain. [GribbleNation, this webpage has photos about adding the second tube.]
This source specifies 4,300' (1311m) for the 1957 northbound tube and 4,381' (1335m) for the 1991 southbound tube.

This is another view of the north portal to emphasize the retraining walls. They had to remove the side of the hill to make room for the new 1991 southbound tube.
Street View, Jul 2025

mcall
"Construction of the second tunnel in 1989."

Daniel Kauffman posted five photos with the comment:
Pennsylvania Turnpike's...Lehigh Tunnel, Lehigh and Carbon Counties.
A foggy ride into the mountains ⛰️ 
 The only road tunnel in Pennsylvania traversed by the Appalachian Trail is located under a major ridge of the Appalachian Mountains (Blue Mountain) that separates the Pocono Mountains Region and the Lehigh Valley Region. This tunnel consists of a North bound and a South bound tunnel, constructed at different times. My photographs are of the Northern tunnel, constructed in the 1950's and is a drill and blast, rectangular-shaped tube. This tunnel is lined with tiles that have become quite a driving distraction. Tens of thousands or about 20% of the tiles have become dislodged, some say due to maintenance policies, others mention seismic activities. The Southern constructed in the 1990's and is a New Austrian Tunneling Method, oval-shaped tube. This tunnel had a  bizarre occurrence in 2018, 70 year old truck driver Howard Sexton was mortality wounded by a 10 foot section of metal electrical conduit pipe that became dislodged because of corroded steel straps that fell and crashed through his cabs window. Howard was able to control his rig and pulled to the side a mile down the highway. Blue Mountain tunnel system....
Dave Costello: I always wear a set of amber or clear SHOOTING safety glasses going through the NB side. If you want to know why, just take a look at the ceiling at all of the missing tiles and then ask yourself what happens when one of them hit your windshield while you are doing 55+ mph. Pretty obvious what’s going to happen. You are going to get a face full of glass. I also firmly believe that the Pa Turnpike Commission doesn’t want you to know this. IYKYK
1

2

3

4

5

Since there is a curve in the road and the oval portal is on the right side, this is the north portal.
Pennsylvania Things posted
BREAKING: Pennsylvania officials remind motorists that the Lehigh Tunnel is the only place where 70 mph traffic collectively agrees to slow down for absolutely no reason.
Drivers who were just fighting for their lives on the Turnpike suddenly enter the tunnel, become model citizens, grip the wheel at 10 and 2, and stare straight ahead like they’re taking their driver’s test again.
Then the second daylight appears, everyone immediately returns to felony speeds.
The Lehigh Tunnel remains undefeated.

I can't determine if this was the original north or south portal.
dr-sauer, this webpage has several photos about the construction work done between 1987 and 1991.

New Austrian Tunnelling Method (NATM)


The reason why the 1991 tube has an oval opening instead of the rectangular opening of the 1957 tube is that it used the New Austrian Tunnelling Method (NATM). NATM is still a drill-and-blast technique, but it uses techniques that reduce the cost of the support liner. First of all, only short segments are done at a time, and the design of the support liner is changed to reflect the rock that was bored through. The contract needs to be flexible to change the design as the rock conditions change. Secondly, the tunnel is removed in layers.
aates

After a segment is drilled and ballasted, a venilation system at the crown of the tube is extended to removed the harmful gases and dust. Then the debris generated by the blast, called muck, is removed.

aates
"The process of applying a thin layer of mortar on the excavated area of the tunnel is called face sealing concrete. This layer is imperative to prevent the loose material from falling. Depending on the geological conditions and stability of the exposed surface, a minimum of 30 mm to a maximum of 50 mm thickness of sealing shotcrete is typically applied."

The bore is allowed to deform to reduce stresses in the rock. But 3D instrumentation is used to measure if the deformation exceeds thresholds. If the deformation is too much, "timely interventions" are implemented. 
aates

Then a "lattice girder" is installed and a layer structural shotcrete is applied over the steelwork. The thickness of the layer is determined by an analysis of the deformation data.
aates

Finally, rock bolts are installed through the shotcrete into the surrounding rock.
aates
"The primary purpose of rock bolting is to “stitch” the rock mass and the shotcrete lining together. This integration helps control displacement and discontinuities, and improves the overall load-bearing capacity of the tunnel cross-section."

aates includes a table that compares Tunnel Boring Machine (TBM) with NATM. NATM can be better for shorter tunnels and/or tunnels with complex (variable) geology.


Thursday, July 30, 2026

1878+1962 NS/Southern/CNO&TP Nemo Tunnels #22, #23 and #24 near Wartburg, TN

Old #22: (Archived Bridge Hunter; Bridge Hunter; Satellite, south portal. Note bridge pier just south of the portal.)
1929 Pedestrian Bridge: (Archived Bridge Hunter; Bridge Hunter; no Historic Bridges; Satellite)


1 of 29 photos posted by Matt Murphy
Nemo Tunnel last week [Jul 2026]— at Nemo Tunnel.
[Note that the tunnel provides plenty of clearance for double-stack container cars.]

I think Matt was at the south portal of New #24.
"First Train", company photographer via BridgeHutner_new_#24

The old tunnels were built in 1878. The were 15' (4.6m) wide and 20' (6m) high. In 1962, they were bypassed by tunnels that were 20' (6m) wide and 30' (9.1m) high. Old #24 was replaced by an adjacent New #24. Old #22 and #23 were replaced by New #22 and a new bridge on a new alignment. The right-of-way with the new tunnels is in purple in this map. The tunnels marked with dashed black lines are the old tunnels.
1980/88 Lancing Quad @ 24,000

In addition to building new tunnels, a lot of dirt was moved. This view of the north portal of New #24 also shows the new NS bridge over the Emory River.
company photographer via BridgeHutner_new_#24

Looking the other way along the bridge, we se the south portal of New #22.
2012 photo by Shane Passmore via BridgeHunter_new_#22

1906+1927 Nemo Bridge


There is a third span hidden in the trees because over half of this bridge is over a flood plain.
Street View, Sep 2015

It is faint, but we can see the third truss in this photo.
BridgeHunter_pedestrian

I think 1923 is a late date to still be building a pin-connected bridge.
2010 photo by Calvin Sneed via BridgeHunter_pedestrian

RedGlobeReflections

We can see a hint of the third truss in this photo.
2010 photo by Calvin Sneed via BridgeHunter_pedestrian

Thursday, July 9, 2026

1940+1965 I-76 (Pennsylvania Turnpike) Blue and Kittatinny Mountain Tunnels

Blue: (Satellite) 4,339' (1,323m), the shortest of the four active turnpike tunnels.
Kittatinny: (Satellite) 4,727' (1441m)

When the turnpike was built, the tunnels were just one tube. They became a severe bottleneck before the second tubes were finally added.

Jackson-Township historical preservation posted
Blue Mountain Tunnel, located in Franklin County, was one of the eight tunnels on the Pennsylvania Turnpike, around 1960.  The Blue Mountain Tunnel was originally built as a two-lane tunnel in 1940. It was later expanded in the 1960s to include an additional two lanes. The tunnel is located 600 feet east of the Kittatinny Mountain Tunnel, separated by the Gunter Valley. 
(Photo from Jeff Wright)
Chris Gennaula: Actually, the tunnel was started in the 19th Century as part of the South Penn Railroad.

These street views are taken from the same location in Gunter Valley. That is, the tunnels are close to each other.

Looking East at Blue Tunnel
Street View, Nov 2025

Looking West at Kittatinny Tunnel
Street View, Nov 2025

1973/73 Doylesburg Quad @ 24,000

Saturday, July 4, 2026

Aban/B&O #5 Tunnel near Claysville, PA and US-40

West Portal: (Satellite, this link has photos.)
East Portal: (Satellite)

Bridges & Tunnels by Sherman Cahal posted four photos with the comment:
This is Tunnel No. 5 of the Baltimore & Ohio Railroad’s Wheeling-Pittsburgh Subdivision. Completed in 1857 for the Hempfield Railroad, it remained in active railroad service until 1985, when the Baltimore & Ohio Railroad sought to abandon the line because of declining freight, particularly coal traffic.
A portion of the former rail corridor has since been converted into a rail trail west of the tunnel. However, the reuse of Tunnel Nos. 4 and 5 has been delayed by falling brickwork in one tunnel and an unresolved dispute with a private landowner.
🔗 More photographs and the full history are available through the link in the comments. A visit helps support Bridges & Tunnels's ongoing work documenting these places through research, photography, and preservation-focused storytelling.
Bridges & Tunnels by Sherman Cahal:
For more photographs and the full history, visit Bridges & Tunnels, an independent, ad-supported website that has been documenting bridges, tunnels, and other infrastructure for 20 years. Every visit helps keep this work going by supporting travel, research, photography, and website hosting.
Bridges & Tunnels by Sherman Cahal shared
1

2

3

4

1964/66 Claysville Quad @ 24,000

While looking for the tunnel, I noticed the "Old National Pike." Sure enough, US-40 and I-70 go through here. US-40 Overview
TopoMapExplore

1958

Thursday, July 2, 2026

Trail/Milwaukee Renslow Trestle and Johnson Creek Tunnel near East Kittitas and Boylston, WA

Trestle: (Satellite)
Tunnel: (Satellite)

Looking East:
Street View, Jun 20223

John Harker posted four images with the comment: "This scene was photographed on June 30th 1965, looking up from Boylston Road east of East Kittitas, Washington.  A Milw east bound freight with EF-5 Box motors E39 B-C-D-A and a GP9 was crossing Renslow Trestle (EE-320), climbing a 1.6% grade for about five miles to Johnson Creek Tunnel just east of Boylston.  A Milw Coast Division 1964 employee time table, a track profile and a USGS topo map are included for reference.  No photographer was listed.  John Harker image scan and editing from an original Kodachrome slide."
1

2

3

4

West Portal:
Franklin Wirtz, Aug 2022

East Portal:
Franklin Wirtz, Aug 2022

In addition to trestles and tunnels, the Milwaukee had to build a lot of cuts and fills. 
Cut:
a z, Jun 2020
a z, Jun 2020

And this is what the fill and cut looks like on a topo map.
1953/57 East Kittitas Quad @ 24,000

Once you know what to look for, the fill and cuts are easy to find on a satellite image. The two blue dots are the locations of the "a z" photos above.
Satellite

Friday, June 12, 2026

$84m Canyon Tunnel Collapse, Apr 14, 206, a Woman Worker Was Killed

Inlet: (Satellite)
Outlet: (Satellite)

The Canyon Tunnel is yet another water supply project in California.

The tunnel will be 12,000' (3.7km) long. The collapse was 200' (61m) into the tunnel. [modesto]

This scene is at the outlet.
2:14 video @ 1:08
3 impacted in Northern California tunnel collapse
One person is dead and another was taken to the hospital after a collapse at the Canyon Tunnel Project on Tuesday, the Modesto Fire Department said. A third person impacted by the collapse was unhurt.

The worker who was killed was 35-year-old engineering advisor Twyla Capurro. She is survived by two children.

The existing irrigation canal was cut into the side of steep Sierra foothills, and it is at risk for landslides and rockfalls falling into the canal and cutting off the water supply. The video contains scenes of workers removing rock from above the canal.
4:32 video @ 0:19
Canyon Tunnel Project | Introduction 2021 | Full Length

CanyonTunnelProject_FAQ
[This project website doesn't say boo about the collapse and the impact on the project.]

I've read before that the rock in California is "incompetent" because of all of the earthquakes. It seems that a risk of a tunnel collapse would be worse than the risk of a landslide in terms of the impact on the water flow. I hope they don't spend $84m in vain.