![]() |
wsdotblog It was 371' (113m) long. |
![]() |
wsdotblog, cropped In 2014, it was reinforced and moved 60' (18m) upstream to make room for the replacement bridge. Then in 2015, it was moved to the right-of-way of the future WA-127 road waiting for someone willing to repurpose the truss. Since WSDOT did not receive any qualified proposals, it is being scraped to make way for the construction of the new road. |
Aug 2025:
No comments:
Post a Comment