The percentage of steel can get rather high.
Building America USA posted Unleash the Power of Reinforced Steel |
Pre-Tensioned Prestressed Concrete
For concrete structures that can be constructed from many members of the same size such as the beams or girders in a bridge, precast plants are generally used. Rather than build a lot of complicated form work in the air at the bridge site, a few forms are built in the factory and used over and over again. After the beams have sufficiently cured at the factory, they are trucked to the site, and lifted in to place with cranes.
Having forms in a factory setting that are used to construct many beams made it feasible to prestress the steel members in the beam so that the concrete is always under compression. Specifically, the rebar is replaced by steel cables that are longer than the beam and that stick out of holes in the form's end. Before the concrete is poured into the form, hydraulic jacks are used to pull each rod to 5000-8000 psi of tensive force. After the beam is poured, it stays in the form until it has enough compressive strength to resist the tensive force in the cables. Then the tensive force is slowly released from the cables to compress the concrete. Now when a load is applied to the beam, instead of creating tensile forces below the centroid of the beam, the applied load just reduces the compressive forces. With only designed loads applied, the concrete never experiences tensile forces. Also the compressive forces added to the bottom of the beam causes the middle of the beam to camber (curve) up. (3:17 in video) This prevents the beam from sagging when a load is applied and makes it look safer.
I've seen references to "bulb" prestressed beams. The difference between I-beams and "bulb" beams is that the tension members are more spread out in the soffet (lower part) of the beam.
California I-Beam | California Bulb Beam |
Virginia Bulb Beam |
Highway Engineering Discoveries posted Construction of Box Girder, Reinforcement work Eng.Abdisamed Lixle posted Pre-tensioning is a technique used in the construction of roads and bridges to improve the strength and durability of concrete structures. It involves the following steps: 1. Tensioning Steel Strands: Before the concrete is poured, steel tendons are stretched along the length of a casting bed. 2. Pouring Concrete: Once the tendons are tensioned, concrete is poured around them. As the concrete sets, it adheres to the tensioned steel. 3. Cutting the Tendons: After the concrete has reached a sufficient strength, the tendons are cut. The tension is transferred from the tendons to the concrete through the bond, effectively compressing it. The pre-tensioning process imparts compressive stress to the concrete, counteracting the tensile stresses that will occur when the structure is put into service. This enhances the load-carrying capacity of the structure and helps to control cracking, leading to more durable roads and bridges. The use of high-strength concrete and larger diameter strands in pre-tensioning allows for longer spans, increased girder spacing, fewer girder lines, and shallower superstructures, resulting in improved economy. It also presents challenges regarding fabrication, handling, shipping, and erection of long, slender girders, which are addressed through design optimization and construction technology Pre-tensioning is a critical component of prestressed concrete, which is a fundamental material in modern infrastructure, providing the necessary strength and resilience for heavy loads and long-term use. Michael Lee: Not just bridges. Structural prestressed precast concrete for buildings. Double tees, hollow core slabs, beams, etc. too. John Franklin: The prestress is lost over time because of the relaxation of the strand and the creep and shrinkage of the concrete. The loss can be as much as 30% |
Post-Tensioned Prestressed Concrete
A limitation with pre-tensioned concrete beams and girders is that the length of a span (distance between piers in a bridge) is limited by the length of what can be trucked to the site. An advantage that steel plate beams had over concrete beams is that several beams can be joined together to create a longer span. For example, four field joints were used for the Seneca Illinois River Road Bridge to create the center span of 364 feet. Post-tensioning is an additional prestressing technique that allows multiple beams, or segments, to be used in a span. The dotted circles in the above California Bulb-Tee design are optional post-tensioning ducts. They are tubes placed in the form before the pour to create holes through the beams. During construction, falsework (temporary scaffolding) is used to hold the beam segments in place while they are being erected. After the segments are in place, tendons that are long enough to go through all of the segments are pulled through the ducts. A tendon consists of 7 high-strength steel wires wound together. Then a hydraulic or screw jack is used to pull the tendons about 4 inches for every 50 feet of length to apply 33,000 pound of load. (ConcreteWork) Bonded post-tensioned concrete means that grout is pumped into the ducts after the tendons have been stressed. And unbonded means that a protective lithium based grease was used instead of grout to protect the steel from corrosion. When pumping the grout, care must be exercised to avoid leaving any voids. Bridges have collapsed because of tendon corrosion. (Wikipedia)
Below is a pick during the construction of the I-355 Des Plaines River Valley Bridge. On the right side of the picture, under the beams that have already been placed, you can see the falsework. And on the far end of the picked beam you can see a segment brace that has been added to support this segment with the end of the segment that has been placed on the false work. And on the near end you can see the four ducts that have been cast in place.
Time 3:08 in video |
See jacks for some pictures of the big multi-strand stressing jacks needed for bridge spans. They have a table of jack sizes, and I notice that the largest can apply 150000 kN (or 21,756 psi) to 108 0.6"-strands and stretch them up to a half-meter. And it weighs almost 6 tons! And another manufacture illustrates equipment to cut, wind, and push the tendons as well as to stress them.
Another major application of post-tensioning is in the slabs (ceiling/floor) of buildings. It allows the slabs to be thinner and/or the columns spaced further apart than reinforced concrete would allow. Thinner slabs not only means less concrete needs to be pumped into the building, it means a lower overall building height for the same floor-to-floor height. In turn, this reduces the weight of the building, the pressure needed to pump concrete to the upper floors, and the costs of the mechanical systems and facade materials. The reduced weight also reduces the foundation costs. (DSI) The size of the hydraulic jacks used to tension slab tendons is much more manageable.
Copyleft, Shakespeare at English Wikipedia |
I found pictures of rigs to place the bridge segments in the Facebook group "Railroad Maintenance of Way Photo's."
Photo posted by Wayne Helms |
Photo by Jim Kissane of the Leroy Selmon Expressway in Tampa in a comment in the above Facebook link |
Jim Jacobs -> Rail & Highway Heavy Loads |
U-beam, 202' total length, 400,000+lbs. Axles spread to 16'. I was the rear steer driver for a dozen of these loads going to I-595/I-95 over passes a month ago. This was on the I-75 South on ramp from Hwy. 27.
Jim posted the following as a comment to his posting.
Jim Jacobs -> Rail & Highway Heavy Loads Putting one in place. |
This video implies a choice must be made. I would think they would want to pre-tension a beam so that it is strong enough that it can be lifted and hold the dead loads. And the post-tension so that it is strong enough to hanle the additional live loads.
4:38 video |
The Corola Bridge in Germany collapsed. Casey Jones thinks it was a post-tensioned bridge and provides some background information about these designs.
8:45 video @ 3:38 |
The new Pensacola Bay Bridge uses concrete for the pilings as well as some superstructure components.
Most of a new hydro power plant is made with reinforced concrete.
Most of a new hydro power plant is made with reinforced concrete.