Sunday, October 9, 2022

Liebherr LTM 11200-9.1 was the largest telescopic boom crane

I'm now seeing videos of this crane being used in building (and updating) wind turbine farms, so I now have enough material for a dedicated page.

This article includes photos of large Liebherr mobile cranes.

(Update: A comment below states that this photo is a "Chinese XCMG crane, similar in size and arrangement to the Liebherr crane." So it seems we have two "world's largest.")
John W. Coke posted
The Most Powerful Mobile Crane in the World… and actually a monster of a truck. Meet Liebherr LTM 11200-9.1 – Built by the German company Liebherr Group, this colossal mobile crane has the longest telescopic boom in the world – 100 meters (328 ft)!
Dennis DeBruler Thanks for the confirmation that this 9-axle crane is the worlds largest.
[Note how the wheels turn more the further they are away from the center. ]

RC KN posted
166_Liebherr LTM 11200-9.1 (Allgemein)

I let these notes set as a draft too long because the 11200-9.1 is no longer the largest. They now have 10-axle cranes. Actually, "largest" is probably like steam locomotives --- it depends on how you measure. The Liebherr may have fewer axles, but I think it still has the longest boom.
safe_image for World’s Largest All Terrain Crane
The implied 6:28 video
The last crane in the video, QAY2000, has a 2000 ton capacity and 12 axles.

But this one is still a bigone.
John W. Coke posted

John W. Coke shared
9 axles from the other side
The telescopic boom is 100m and a lattice jib of up to 126m can be added. It can hold 202 tonnes of counter weights and its maximum driving speed is 75km/h (47mph). In addition to a massive boom, it has "Y telescopic boom guying" (Y-suspender) to significantly increase the load capacity. It can lift 1200 tonnes @ 2.5m. [Liebherr] "The LTM 11200-9.1 is both the the strongest and tallest telescopic crane in the world, lifting up to 1,200 tons (that's 2,645,000 pounds or 12 adult Blue Whales, depending on who's counting). Its eight-part telescoping boom extends up to 328 feet (50 feet taller than the last record holder) and, with the addition of a lattice jib, has a maximum lift height of 630 feet, more than 50 stories high! Though, despite its 445,000 pounds of counter-weight, when the LTM 11200 is picking up 2 million+ pounds, it can only extend about eight feet laterally without tipping." [gizmodo]

Liebherr
The orange truck and trailer in the above photo is used to carry the boom separately when it travels on a highway. More on that later.

An example of it being used with a luffer jib for extended radius.
Liebherr

An example of using a luffer jib for height and boom clearance.
Liebherr
Heavy lift configuration
Liebherr

An example of  when I don't know why they are using a luffer since it makes assembly more complicated.
Liebherr

Gerardo Pergamo posted

They do offer a "wind tip." That is, a fixed jib with an angle to keep the rotor assembly away from the boom but still maintain a small radius. But we see an example where one operator just lifts the rotor with a straight boom.
Liebherr PDF, p 9
Liebherr PDF, p 14

Watch at least the first part of this video (until 1:40) where they mount the boom on the base unit before watching the next video. The next part (until 5:21) where they add the counterweights is also applicable to the next video.
(new window)


(new window) Fortunately, the video is a lot better than their thumbnail. I don't understand German, but the above animation teaches me what they are doing. The reason I recommend watching the first part of the above video is that this video uses the current fad of a bunch of short closeups, including worker's faces. I would have no clue what was happening without the context provided by the above video. This video does teach me that the Y-suspender frame is also transported separately and added after the boom is added. Unfortunately, they quit before showing the boom being extended.

(new window) A LTM 11200 lifting a blade. When a crane is this big, you also need to walk away from the object to get an overview shot. That must be a big wind turbine if they are assembling the rotor in the air with such a big crane. I wonder how the load chart for this crane compares to the Manitowoc MLC 650.


(new window) This video answers my question about moving from one tower to another in a wind turbine farm. That is when the crawlers in America have their accidents. (That is, they fall over!) Obviously, they retract the boom before moving. That is one of the main advantages of using a telescopic boom. Some crawlers move with the boom still way up in the air giving them a high center of gravity. They do remove the block and counterweights. But they leave the counterweight plate on. That is why they almost did not clear a couple of fence gate posts. Significantly, they build a good road for the crane to drive on. If American contractors did that, fewer crawler cranes would tip over. Some contractors won't even lay mats on farm fields in front of the crawler.


(new window)  The crane at the beginning of this video is just a helper crane. We first see the 11200 when it is lifting a blade. This video also shows a move between towers. Fortunately, the video uses time lapse when appropriate. Again, the contractor prepares a good road between the towers and the wind turbine must be big because the rotor is assembled in the air.


(new window) Even though removing the boom is very similar to adding a boom, I include this because it is more detailed. It shows they have to use some muscle power to swing the support arms out. But then they hook up a portable hydraulic pump and everything else is done with hydraulic power. Even the pin that hooks the big lift ram to the boom is moved hydraulically. At 12:24 we see a demonstration of crab-mode steering. And when it goes straight again, we see some of the tires are spinning.
At 9:14, I decided that when it is break time they turn off the hydraulic pump and leave the poor videographer to figure out how to kill time. Once again, the crane was used to build a wind turbine farm.



Another disassembly video. At 4:02 it shows a boom dolly being loaded, which is a scene that was missed in the above video. At 7:19 it shows a flatbed trailer with a lot of axles because it is carrying counterweights. It also has a big tool box and a SUV. And I think the thing on the back is the hydraulic pump used to operate the outriggers of the boom. 

(new window)  Many scenes of this Liebherr LTM 11200 have wind turbines in the background. (Using a love song as the background music is a rather bizarre choice. I like cranes, but I don't love them.) They never do show the final assembly!



https://www.youtube.com/watch?v=vTN40Ng5GE4 raising a boom with luffer to a low jack-knife position

https://youtu.be/SKY4qrTZb3s  assembling the luffer jib joint and Y-suspender, another wind turbine farm job   13:41 is the first time I have seen a mobile crane "walk" with a load. In this case the four outrigger pads are up as it repositions to lift the next segment of the luffer boom. I'm sure that it is important that the load is positioned along the long axis of the truck since the outriggers are up. At 14:32 we see a crane with a luffer jib being operated with three segments of the boom extended.


Carson Oliver posted
Hi I am world's largest mobile crane
[The comments identify some larger cranes.]

1851-1912 Waugoshance and 1910 White Shoal Lighthouses

Waugoshance: (Satellite according to waugoshance.org; the Google Map label is not accurate)
White Shoal: (Satellite according to NOAA; the Google Map label is accurate)

(There is also a Lansing Shoal Lighthouse on Lake Michigan. It is now abandoned. Comments on that post explain that the Coast Guard maintains the LED beacon in the lantern room, but not the building itself since it is now privately owned.)

At the end of these notes I discuss "satellite images."

The Waugoshance lighthouse replaced a lightship that was stationed on Waugoshance Shoal in 1832. It had red and white horizontal stripes when it was in operation. In 1912 it was replaced by the White Shoals Lighthouse. During WWII, the Navy used it as a bombing target by early drone aircraft. [MightMac]

LighthouseFriends has details about the construction and maintenance of the lighthouse.

This video includes an explanation of why this area was so dangerous to shipping.

Chris Roxburgh posted
The Waugoshance lighthouse was built in 1850 15 miles west of the Mackinac bridge in Lake Michigan. Legend was that the light keeper John Herman after heavily drinking loved to play jokes on his assistant. John locked his assistant in the lantern room one night and by the time the young man got out of the room John was gone and never seen again.
Aaron Thompson: When the [preservation] society dissolved, the lighthouse went back to the government and they said they won't put a dime into it restoring or demolishing it. My friend and I (who was the president of the society) would like to at least save the birdcage top on it but he said we'd have to wait for it to fall and catch it before it hit the water or we could be in a lot of trouble.
[They could not raise enough money to stabilize it, let alone restore it.]
Glenda Jill shared

Joli McSwain Morris commented on Chris' post
At one time it was a sight to see I bet.
 
Dianna Higgs Stampfler commented on Chris' post
One of the great haunted lighthouse legends of Michigan!
I first heard of John Herman and his spirited story in the late 1990s. The incident in question happened on Oct 14, 1900 (the anniversary coming up next week). When I was researching my book, Michigan's Haunted Lighthouses, I dug into John’s story further and found that he actually died (10-14-1900) of a heart attack on Mackinac Island (not falling over the edge of the lighthouse). In fact…by the time the assistant was locked in the tower, John he been dead for hours! Maybe the reason they never found a body was it was his ghost that was responsible for this antic? 👻
As for the current condition of Waugoshance…after being abandoned in 1910, it sat vacant and was used during WWII for bombing practice (some very rough videos of this are on YouTube). It is now on Lighthouse Digest’s “Doomsday List” and sadly will eventually crumble into the lake.

Aaron Thompson commented on Glenda's share
Here's something I wrote a few years back:
auntings at Waugoshance. Legend has it that lighthouse keeper John Herman was quite the prankster as well as a drinker. Story is, late one night in 1900, keeper Herman, in a drunken stupor, locked his assistant keeper in the lantern room as a practical joke. By the time the assistant was able to free himself, Herman was nowhere to be found and was never heard from again. It is believed that in his drunken state, he fell off of the crib and drowned in the Straits of Mackinac. After that, several keepers refused assignment at Waugoshance, citing rumors that it was haunted. The one's who did take the job though reported incidents such as coal buckets being filled on their own, furniture being moved around and their chairs being kicked out from underneath them as they slept. Some people have said if you travel out that way, you can feel a strange aura coming from the lighthouse (I've never felt it) so be careful, or you may end up as one of Mr. Herman's practical jokes. Muhahahahaha.
Wayne Sapulski: Aaron Thompson it all makes for a good story, but Herman died ashore and remains buried ashore.
Aaron Thompson: Wayne Sapulski yes, I know. He died on Oct 14th 1900 on Mackinac Island.

Aaron Thompson commented on Glenda's share
Waugoshance Point Lighthouse in it's heyday and what she looks like now. Opened in 1850 and deactivated in 1912. Located approximately 17 miles west of the Mackinac Bridge. It is believed that the fire that burned up the keeper's quarters started in 1943 when it was being used a bombing target for WWII by the US Navy. Story is that there was heating oil in the building and it sparked the fire. It is also believed that those bombs are what took out the roof and windows of the lantern room exposing the "birdcage" top. The big crib you see is entirely under water now. The small building in the front was taken out by ice in 1986. The water levels were over top of the crib and when it froze and the ice moved out, it took that little building with it. The boiler plate (the piece hanging off in the 2nd photo) was installed in 1881 because the bricks were starting to degrade. They poured cement between the boiler plate and the bricks and put anchor plates into the cement to secure it. Those anchors eventually gave way. You can still see the cement (left side of the photo) and that is what give her that texture. Some people think it is a crack in the tower. Sadly, people would travel out to the lighthouse and pilfer some of it's belongings. It is rumored that the staircase to the lantern room now sits in someone's house in Harbor Springs. The last photo I took, the hole on the right next to the door opening is from one of the bombs during WWII.
 
Kevin toombs commented on Glenda's share
To see it up close in person, it’s amazing it’s still standing.

Jan 20, 2021: HarborLightNews
"Efforts to save Waugoshance light abandoned as structure crumbles into Lake Michigan."
The high lake levels over a couple of years has eroded the base.
"The lighthouse at Waugoshance was arguably the first light built in the Great Lakes that was completely surrounded by water. Both its construction and its continued maintenance were extremely hazardous due to the severe weather conditions of the area."

Justin Billau Flickr, CC BY 2.0 via AtlasObscura
AtlasObscura describes the drone testing program that the Navy worked on in response to Japanese Kamikaze attacks.

"By the end of the 1880's the size of the vessels plying the Great Lakes was increasing. These larger vessels, drawing more water, began entering the Straits of Mackinac at a point approximately four miles further North, in an area of deeper water. The White Shoal reef sat perilously close to this new passage, and in 1878, the Chicago Lumbering Company stationed an old derelict vessel over White Shoal to warn mariners of the danger lurking a few feet beneath the waves." Construction of a permanent lighthouse began in 1908 and was finished in 1910.  [TerryPepper]

PreserveWhiteShoal
"United States' only barber-pole lighthouse."
It is currently closed for restoration, but it should "re-open for public tours beginning in July 2024!."
 
Great Lakes Lighthouse Keepers Association posted
Unique in all the world, the beautiful White Shoal Light, MI on Lake Michigan - Photo by Bryan Dort at Photic Zone. The White Shoal Light Historical Preservation Society is the non-profit group working to restore this Michigan icon.
Wayne Sapulski shared
 
Great Lakes Lighthouse Keepers Association posted
A preliminary cross-sectional view of White Shoal Light, MI on Lake Michigan dated October 30, 1907 - Diagram courtesy of the White Shoal Light Historical Preservation Society.
Robert Adams: Walked those stairs many times tending this Light for the CG, '85-'88.
[As some comments observed: vertical living.]
Michigan Film Photographer Karl Wertanen shared
This is great. Usually you don’t associate Great Lakes lighthouses with having rooms and floors as they rise. Love the different doors and rooms. This would be a great lighthouse to tour.

MichiganLights describes the architectural style as "integral to tower." Looking at a photo, it is obvious that that means the living quarters are inside the tower. Waugoshance is an example of a lighthouse that had a separate building for the living quarters.

LighthouseFriends, Photograph from National Archives
"The wooden crib was towed to White Shoal by the tug Morford and then sunk using stone from the barge Gillen and the steamer Progress."

If you access the GPS coordinates in the satellite links at the top of these notes, you don't see anything. I've concluded that Google Maps doesn't bother to process satellite images over open water. And I've confirmed that Bing Maps also doesn't display anything. So I fired up Google Earth. This is one of the better images of a lighthouse that I could find. Because of its location and the fact that most of the images have that white line to the east similar to the one in Justin's photo above, I think this is the Waugochance Lighthouse. The lighthouse was built on the west end of the shoal that caused it to be built. I don't think Google Earth processed satellite images out where the White Shoal Lighthouse is located.
Google Earth, Dec 2008

Over land, Google Earth's resolution is better. This is the 20'x20' BP filling station building at Ogden & Main in Downers Grove, IL.



Friday, October 7, 2022

1833-1920 Trent-Severn Waterway in Ontario, CA

"Trent Severn connects Trenton on Lake Ontario to Port Severn on Georgian Bay. A distance of 387 km (240 miles) and a rise of 180 meters (590 feet) above Lake Ontario and 80 meters (260 feet) above Georgian Bay at the Trent systems highest point, Balsam Lake. The lifting and dropping process incorporate 41 locks, a marine railway and two hydraulic lift locks including the worlds highest, 65 foot lift (20 meters), located at Peterborough Ontario. The system was started in 1833 and completed in 1920." It is currently owned by Parks Canada. [TheTrentSevernWaterway]

Parks Canada

TheTrentSevernWaterway
The "41 locks, a marine railway and two hydraulic lift locks including the world's highest, 65 foot lift (20 meters), located at Peterborough Ontario," provide a navigation depth of 6'. The summit is at Balsam Lake, which is 180m (600') above Lake Ontario and 80m (250') above Lake Huron's Georgian Bay. "Standard lock dimensions are one hundred and twenty feet long by thirty-two feet wide. The two exceptions are the lock 44, the Big Chute Marine Railway at one hundred feet long by twenty-four feet wide and lock 45 at Port Severn is only eight-four feet long and twenty-three feet wide setting the limit if you wish to traverse The Trent Severn Waterway from one end to the other."

Structures that have a dedicated notes file:

#11-#12 - Ranney Falls, 46.9m (154') x 9.7m (32') x 14.6m (48') (Satellite)
One of the two double locks
 
#16-#17 - Healey Falls Flight Lock, 46.9m (154') x 9.7m (54') x 8.2m (54') (Satellite)
One of the two double locks
Additonal photos of these locks are available in my notes on the adjacent hydro plant.

#21 - Peterborogh Lift Lock, 36.6m (120') x 9.7m (32') x 19.8m (65') (Satellite)
Opened on July 9, 1904, it is the highest hydraulic lift lock in the world, 65' (20m).

Street View, Sep 2021 via Dennis DeBruler (Satellite)
#34, 36.6m (120') x 9.7m (32') x 7.2m (24')

#36 - Kirkfield Lift Lock,  42.2m (138') x 10.2m (33') x 14.9m (49') (Satellite)
"The Kirkfield Lift Lock is the second highest hydraulic lift lock in the world with a lift of 15 metres (49 ft). The lock is situated at the highest point along the Waterway at 256.20 meters (840.5 ft) above sea level."

#42 - Couchiching, 47.2m (155') x 9.7m (32') x 6.2m (20')

#44 - Big Chute Marine Railway, just 30.5m (100') x 7.3m (24') x 17.7m (58') (Satellite)
"It is the only marine railway of its kind in North America."
"Operators whose vessels weigh more than 68t (75 tons), have a peculiar hull configuration or who foresee problems lifting the hull by sling, must contact Trent–Severn Waterway at 705-756-8802 at least 48 hours in advance of trip."

#45 - Port Severn, just 25.6m (84') x 7.0m (23') x 3.7m (12') (Satellite)



Trent-Severn Waterway National Historic Site, Parks Canada posted
Work to remove bedrock from below the dam at Lock 45 - Port Severn is nearly complete. ✔.
This work will improve the efficiency of the dam and prevent localized flooding.
https://parks.canada.ca/.../infrastruc.../severn-gravenhurst


TalesFromTheAmericanWaterways-1, Locks #11 and #12, one of many photos in this travelog
"Unlike the Erie Canal, the locks are all manually operated, but not, as in England, by the boaters themselves.  Each lock is staffed by two or three people, many of them students doing a summer vacation job, but all friendly and helpful."
[Most of the locks have a 2 day mooring limit. I noticed that this one allows 5 days. Tourists from the canal must be an important part of Cambellford's economy. A suspension bridge paid by public subscription spans the adjacent Ranney Falls. The town also as a Bloomer Chocolate next to a World's Finest Chocolate surplus store. That reminds me of the fudge shops in the tourist towns of Mackinac Island and Metamora, IN.]

TalesFromTheAmericanWaterways-2, one of four photos of the Peterborough Lift Lock
"Two adjacent holding tanks simultaneously move in opposite directions, to take boats up and down the lock.  No electric power is used and the lock works simply by the weight of water in the upper tank being greater than that of the lower one. The lift is 65 ft – at the time it was built, in 1904, it was the largest structure in the world to be built from unreinforced concrete. It is very quick too – the ascent took only a couple of minutes."

TalesFromTheAmericanWaterways-3
From inside the Kirkfield Lift Lock

TalesFromTheAmericanWaterways-4, they have photos of the outside that they took the day before.
"Big Chute is the most awesome thing on the waterway, and eagerly anticipated. It is not technically a lock, but a railway which transports boats up and down the rapids of the Severn River. It was originally constructed as a temporary measure, pending a proper lock being built. Construction of the definitive lock was  abandoned because of cost. Another reason for not progressing the project was that a lock would allow lamprey to move upstream and jeopardize the fisheries of Lake Simcoe. Despite the steepness of the descent, the boats are maintained in a horizontal position by a cunning two-rail system which means that the front of the boat is supported and moves down independently of the back."

Thursday, October 6, 2022

Tampa Bay Gateway Expressway and TyBot

There is no point adding more lanes to the Frankland Bridge unless more lanes are built on the land. So that is what this project does. It is over a half-billion dollars.

fdottampabay

1 of many construction photos on fdottampabay

7:06 video @ 0:16
(More narration and no music would have been nice.)

The Walsh Gruop posted
Read about the TyBot robot that tied 11,044 rebar intersections at our Gateway Expressway project in Florida, setting a 2022 record. https://www.enr.com/.../54387-with-11-000-tie-shift-tybot... [paycount]
The TyBot rebar tying robot, manufactured by Advanced Construction Robotics, can tie an average of 36,000 rebar intersections in a 40-hour week, equal to four to six ironworkers.
Photo courtesy of Advanced Construction Robotics
"In one shift May 12, the TyBot robot tied 11,044 rebar intersections on a job site in Florida, setting a 2022 record....Nix says TyBot usually works in 10-hour shifts, replacing four or five workers who, depending on skill level, can tie 200-300 intersections per hour. "
They are now working on IronBot, which would lay down the rebar ahead of TyBot. Two TyBots would be needed to keep up with one IronBot.
Karen DeBruler, Feb 15, 2023, Released into the Public Domain

0:51 Walsh Group video


Wednesday, October 5, 2022

I-64 1963,1991+2023 (Nitro WWI/Donald M. Legg) Memorial Bridge over Kanawha River

(Bridge Hunter; Historic Bridges; B&T; Satellite)

I-64 crosses the Kanawha River four times in the Charleston area of West Virginia. Going upstream:
In a comment on BridgeHunter, Terry Legg explained that Donald Legg, his father, was a steelworker who died in an accident during the construction of the bridge.

The bridge has been renamed the Nitro WW1 Memorial Bridge. [Doug Bess comment on a post]

Street View, Jul 2022

Street View, Aug 2022

As part of expanding I-64 from two to three lanes, they are upgrading this crossing. In addition to building a new 3-lane bridge, they plan to replace the truss bridge rather than rehab it and restripe it for three lanes and a shoulder. [Tom Hoffman comment in BridgeHunter]

Obviously, the new bridge is a UCEB (Ugly Concrete Eyesore Bridge) steel-girder bridge.
Street View, Jul 2022

1st of 5 photos posted by Bridges & Tunnels
These photos are from June [2022] showing the replacement of the Donald M. Legg Memorial Bridge over the Kanawha River in West Virginia with a pair of new structures.
The Donald M. Legg Memorial Bridge carries Interstate 64 across the Kanawha River in Putnam County, West Virginia. It opened in December 1963. It was noteworthy for being the widest ever constructed in the state, the first to have a center median strip topped with a 36-inch concrete riser and parapet dividing the four 12-foot traffic lanes.
In November 2019, the West Virginia Department of Transportation awarded a $224.4 million design and build contract for a pair of new bridges. the widening of 3.7 miles of Interstate 64 between Teays Valley and Nitro, and the reconstruction of the WV Route 817 interchange.
Construction on the project began in April 2021.
➤ Check out more photos and a history of this bridge at http://bridgestunnels.com/location/legg-memorial-bridge/

Bridges & Tunnels posted
The new westbound Legg Memorial Bridge for Interstate 64 over the Kanawha River between St. Albans and Nitro, West Virginia opened to two lanes of traffic today [Oct 29, 2022].
Construction on the project to build a new westbound bridge, replace the original 1963 bridge, widen 3.7 miles of Interstate 64 between Teays Valley and Nitro, and reconstruct the WV Route 817 interchange, began in April 2021.
In November, work will begin on removing the circa 1963 span to replace it with a girder structure. During that process, the main truss will be lowered to a barge and towed offsite for dismantling while the new structure will rest atop the existing concrete piers.
The entire project is expected to be completed by October 2023.
➤ Check out many more photos from this project at http://bridgestunnels.com/location/legg-memorial-bridge/
Doug Bess: The bridge has now been renamed the Nitro WW1 Memorial Bridge.
 I grew up in Nitro during the 1950s and 60s. It has a rich history and now a museum displaying artifacts from WW1 and subsequent wars.

Update: 
1:00 video @ 0:55
The Donald M. Legg Memorial Bridge has served West Virginia for 60 years. Today, the main span was lowered. When complete, the new Donald M. Legg Memorial Bridge will carry I-64 eastbound between St. Albans and Nitro, while the newly completed Nitro WWI Memorial Bridge carries westbound. This Roads to Prosperity project will widen the interstate and make travel safer for a community which continues to grow.
B&T shared
WSAZ explains: "“Lowering this center section to get it to the side allows them to reach the other sections with the cranes they have to cut it into pieces and demo it,” said Carl Davis, the project supervisor for consultant Mead & Hunt, in the release. “By demoing the bridge, it allows us to also demo part of the existing piers to rebuild and build the new eastbound structure back in the place it is now.”"

We Work the Waterways posted
Amherst Madison’s M/V CHARLESTON upbound on the Kanawha River with 9 empty barges as the pass under the St.Albans/Nitro bridge in this unique drone picture. 
Courtesy of Gary Wendell  Photography.
Bridges & Tunnels posted three photos with the comment:
On Tuesday, November 19, [2024,] West Virginia Governor Jim Justice officially dedicated the new Donald M. Legg Memorial Bridge and Nitro WWI Memorial Bridge. The twin spans carry Interstate 64 over the Kanawha River, connecting St. Albans and Nitro. This project is the largest completed so far under the Roads to Prosperity initiative.
The Roads to Prosperity program is a comprehensive series of funding measures aimed at highway and bridge construction and maintenance. It is the largest infrastructure program in the state's history and has significantly reduced the backlog of construction and maintenance projects across West Virginia.
The original Donald M. Legg Memorial Bridge, completed in 1963, became a bottleneck as Interstate 64 was widened. To address this, work began in 2019 when the West Virginia Department of Transportation awarded a contract to build a new bridge (the Nitro WWI Memorial Bridge) and to replace the superstructure of the existing Donald M. Legg Memorial Bridge. Together, the twin spans double the capacity of Interstate 64 and eliminate a significant safety concern and bottleneck.
1

2

3