Monday, December 20, 2021

Double Bascule Bridge across North Coast Harbor in Cleveland, OH

(Satellite, it is new enough that it has yet to appear on a satellite image)

I determined the satellite location by the William G. Mather steamship and the FirstEnergy Stadium in the background.
Doublas Spott posted
New pedestrian Double Bascule Bridge across North Coast Harbor

Douglas commented on his post

Douglas Butler posted
Photo taken by Douglas Butler the new 2021 North Coast Harbor Double Leaf Dutch Type is in Cleveland, OH.

Theodore Too is in the news because it sank Dec 17, 2024. [Dennis DeBruler]
Official Theodore Tugboat posted
Heelllooo Cleveland. The crew and I are at Oasis Marina until 4pm Tuesday Oct 3 before we start our sail back to Canada. Come on by to say Toot toot

Sunday, December 19, 2021

Southern Pacific Ferries across the Mississippi River in and near New Orleans, LA

Southern Pacific entered the New Orleans area on the south side of the river. and terminated in New Orleans. They used two ferry routes to interchange traffic with northern and eastern railroads and to deliver passengers to the downtown area. I'm going to call the routes "New Orleans" and "Harahan-Avondale".

New Orleans:
New Orleans Side: (Satellite, there are still some tracks left on this side of the river)
West Bank Side: (Satellite)
Harahan-Avondale:
New Orleans Side: (the area has changed too much to identify the location)
West Bank Side: (Satellite)

These ferries were made obsolete by the Huey P. Long Bridge in 1935. The IC W.B. Duncan ferry was reassigned to the Mississippi River when the P&I Bridge made the IC Ohio River ferry obsolete.

New Orleans


Derby Gisclair posted
Railroads needed a way to transport their railcars across the Mississippi River as well. This photograph shows the interior of an unloaded train ferry. The catamaran style sidewheeler from 1900 had two sets of tracks that could accommodate four to six railcars. The terminal was located at the foot of Esplanade Avenue and ran to Morgan's Landing in Algiers.
Jerry Pepper: That one in the picture appears to have 3 sets of tracks! And I think I’ve seen some with up to 4 sets of tracks inside them.

Eric Cormier shared
[There are a lot of comments on this share. Some concern the Admiral, which was built on the hull of this ferry. Others argue if this was a Detroit ferry instead of a NOLA ferry.]

Dennis DeBruler commented on Eric's share
1932 New Orleans NE Quadrangle @ 1:31,680

Nancy Brister [This page has more photos.]

Jack Bobby Lou Mulreavy posted
Southern Pacific car ferry in New Orleans LA

Gary C. Huggins posted
Before the Huey P. Long Bridge opened in 1935, trains were ferried across the river. Southern Pacific's "Sunset Limited" westbound, sits aboard the ferry barge "Mastodon" accompanied by Engine No. 73, a steam switcher, as they are ferried across the Mississippi River from the foot of Elysian Fields Avenue to a landing at Elmira Street in Algiers Point.
The Mastodon, a barge built in 1909 at the New York Ship Building Corporation of Camden, New Jersey, was a 368-foot long, 50-foot wide behemoth which, propelled by tugboats, carried Southern Pacific trains between Elysian Fields Avenue and Elmira Street in Algiers Point.
Wendy BeachWalker: Those "Mastadon barges" still exist! I live on the Santa Rosa Sound in Florida and currently there is a dredging project right at the Destin bridge. Those massive barges create such an undertow, that other boats and pontoons have to use extreme caution to avoid getting into their wake.
We get very serious wave action every time they pass through our part of the sound. Very scary!
Jim Taylor: Wendy BeachWalker there was only one Mastodon and T. Smith bought it after the R/R operations ceased
Mark Imhoff shared

Passenger Train Enthusiasts posted
Blair Kullman: this site has an actual picture of the barge.
https://www.trains-and-railroads.com/sunset-limited-sp
Blair Kullman: and I believe the last comment in this blog is correct. Avondale over to Harahan, LA. IC had a yard that ran north-south in this time frame.
https://aboutmytrains.blogspot.com/2014/02/the-mastodon.html

Christopher L Purdom posted three photos with the comment: "Can’t find dates to go with pictures. Just that this is in New Orleans."
1

2

3

Harahan-Avondale


Jim Taylor posted three images with the comment: "The Southern Pacific R/R car float barge that operated between Harahan and Avondale, Louisiana prior to the inauguration of the Huey P. Long Bridge in 1935 'Huey P. Long bridge had vehicular and rail traffic' Note: The slip remains today at the upper end of the now defunct Avondale Shipyard. Appears as if the barge employed a full time Pilot to run the operation from the barge Pilothouse and docking platform, 'Hand and whistle signals were the norm of the day'"
1

2

3

1932 New Orleans NW Quadrangle @ 1:31,680

Mark Mcgowan posted
This photo, taken December 16, 1935, is of the last train crossing the Mississippi River between Harahan and Avondale, Louisiana on a Southern Pacific barge (freight cars from New Orleans to Algiers also saw their last use of barges the same day), as the Huey P. Long bridge, visible in the background, was dedicated the following day.
(Southern Pacific photo/George C. Werner collection)



Saturday, December 18, 2021

1910 Amtrak/Pennsy North (Hudson) River Tunnel at New York, NY

(Satellite, west portal)

The completion date and correct name for the title were found here.
 
The Marine Buff posted
The Pennsylvania tunnel project in New York City, initiated in 1904, marked a significant engineering endeavor by the Pennsylvania Railroad. The project aimed to establish a terminal station on Manhattan Island, linking it with the Long Island Railroad system. Construction involved clearing buildings on four large city blocks for the passenger station. Tunneling operations began with the sinking of shafts, soon extending from New Jersey to Long Island. The tunnel design emphasized safety, incorporating concrete-filled sides up to car window level to minimize damage from derailments and collisions. Electric cables were embedded in the concrete side benches, and the tunnel featured thorough lighting and refuge niches for employees. This extensive work laid the foundation for what would become a crucial infrastructure component in New York City's transit system.

J.B. Rail Photog posted
A cutaway view showing how Pennsylvania Railroad tracks reached Manhattan.  Interesting stuff.

safe_image for Clock is ticking for 110-year-old Hudson River rail tunnel
Superstorm Sandy flooded the tunnel with saltwater in 2012.

I learned about the Gateway Project for rebuilding rail access to Manhattan from when I studied the replacement of the Portal Bridge. By delaying the construction of a new tunnel, we (taxpayers) now need to pay for repairs on the old tunnel as well as building a new tunnel.

Trump remembered his campaign promise concerning a wall at the Mexico border but forgot his promise about fixing our infrastructer. I wish it had been the other way around.

I was aware that there was a funding issue. I was not aware that the US Army Corps of Engineers was delaying an approval.
safe_image for Project to fix critical Northeast Corridor choke point gets go-ahead

8:11 video: since 2014, needed repairs have caused 65,000 minutes (45 days) of delays (commuter cancellations) and 20% of the nations GDP gets put on hold. The new tunnels are expected to take 7 years to build, and then fixing the existing tunnels would be another 3 years.
The Gateway Project:
Screenshot @ 3:12
(Portal North Bridge)


What may have been.
Fred Hadley posted
The new bridge over the Hudson River New York in 1896
We present a perspective view of the proposed New York and New Jersey railroad bridge across the Hudson River. It shows also the New York approaches and the location of the grand terminal station. The station will be at the corner of Eighth Avenue, Forty-ninth and Fifty-first Streets.
The six track viaduct will run thence west to the block in Fiftieth Street between Tenth and Eleventh Avenues. There, by a broad curve, the viaduct will sweep northward., constantly rising at a grade of thirty-five feet to the mile.
The structure will curve to the westward again at Fifty-eighth Street, and at Fifty-ninth Street and Twelfth Avenue it will reach the end of the bridge structure proper.
The imposing proportions of the bridge and the beauty of its designs are shown in the illustration, and, when we study its dimensions in detail, it is perhaps safe to say that it will be the greatest engineering work ever attempted. This can best be understood by reference to the present Brooklyn Bridge. The main span of the new bridge will be more than twice the length and its towers fully twice the height of those
of the Brooklvn Bridge.
It was originally proposed to erect a bridge of the cantilever system, with a river span of 2,000 feet. This would have necessitated a tower 1,000 feet out in midstream, and, as the War Office requirements demanded that the river navigation should be unobstructed, it was determined by the company to attempt the bridging of the Hudson River by a mammoth suspension bridge, with a great central span of 3254 feet. 
There will be six railroad tracks, and the bridge is to be strong enough to carry all the tracks loaded with trains from end to end, or a total live load of about 30,000 tons.
It is estimated that the bridge itself will cost $25 million and the cost of the whole, bridge, approaches and terminal works, will be about $60 million. Should there be no legal or other obstructions, it is estimated that the work can be completed in eight years.
The design illustrated was made by the Union Bridge Company, of New York City. Like other Hudson crossing proposals, this one was never built. 
Scientific American excerpt and engraving, May 2, 1896

2022 Update: It looks like the route of the new Hudson River Tunnel has changed since 2014. The cost is now estimated at $11.6b. I have seen some headlines that indicate funding has finally been approved.
NewYorkIMBY

safe_image for Amtrak leverages weekend service outages to make critical repairs in North River Tunnel

5:42 video  Dec 2023 cost estimate: $17,180,000,000. Digging starts in 2025 with an expected completion in 2035.

8:04 video @ 1:50
"New York’s $29.5BN Mega-Tunnel"
3:07   The Hudson Tunnel part of the project is $12.4b.

This 10:43 video specifies a $16b cost. If you want to skip the usual "this route is important and at capacity" verbiage, then go to 2:18.

Feb 29, 2024
RailwayAge, cropped (source)

rtands

Weeks Marine, Inc. posted two photos with the comment:
If you’re near the Hudson River in New York or New Jersey, you’ve probably noticed the ongoing work on the Hudson River Ground Stabilization – the first major phase of the Hudson Tunnel Project.
We’re actively working on the Hudson, plunging 140-foot-long steel pipe piles and sheeting into the riverbed to create a stabilized foundation to facilitate future tunneling construction by other contractors. To do this, our team is constructing a temporary cofferdam containment structure to make ground improvements inside. The cofferdam is built in segments 110 feet wide and up to 600 feet long across a 1,200-foot-long corridor. This operation will continue for the next two years and is essential for preparing the ground for the tunnel boring machine and protecting the riverbed from disruption.
Once the project is complete, it will provide long-term reliability and resiliency, benefiting not only NJ Transit and Amtrak users but also travelers throughout the region and nation.

M V Boyce Boyce: Probably be using a Earth, balance tunnel, boring machine set up for a mixed face, which means it will be set up for rock and soft ground and use compressed air. [I was not aware that two years of work is needed before they can use a TBM.]
Kiewit Corporation posted the same information because Weeks Marine, Inc is one of their subsidiaries.
Michael John Hackmer: Is this for a future rail tunnel or auto or both that is planned? Or is it just in case they want to build another tunnel?
Dennis DeBruler: Michael John Hackmer It is for a rail tunnel. I've seen a cost estimate of $30 billion dollars for this Gateway Project. https://www.rtands.com/.../hudson-tunnel-project-ramping-up/
Parth Patel: Dennis DeBruler that's simply not true. It is 16 billion dollars.
Dennis DeBruler: Parth Patel $16b would be just the Hudson Tunnel. The Gateway Program includes additional construction such as the Portal Bridges and refurbishing the old tunnels. And that cost is $29.5. https://www.youtube.com/watch?v=ZMWzTbX2emI
Richard Koch: Dennis DeBruler It’s water over the riverbed now, but all of this would have been finished nearly 10 years ago if Chris Christie hadn’t pulled the plug on the earlier effort when he was elected Governor of NJ in 2009. He gave up $13B plus in federal support so that NJ wouldn’t have to raise fuel taxes for the first time in 15 years to cover the other estimated $2B. That $15B would have covered the supporting infrastructure, not just the tunnel.
1

2

BulletTrains USA.com posted eight images with the comment:
DEVELOPMENT UPDATE: The Hudson Tunnel Project
“The Hudson Tunnel Project involves construction of a new Hudson River rail tunnel serving New York Penn Station and the rehabilitation of the existing Sandy-damaged North River Tunnel.
The high level of traffic in the existing North River Tunnel — approximately 450 trains per weekday — means that without this project, taking one of the North River Tunnel tubes out of service for necessary repairs would severely reduce rail service because the remaining tube would have to accommodate two-way traffic. This very significant reduction in capacity would have a devastating effect on New York and New Jersey commuters who cross the Hudson on a daily basis, Amtrak passengers, and the regional and national economies.”
Some photos source NYC Subway Life
BulletTrains USA.com shared
1

2

3

4

5

6

7

8

Another click-bait YouTube title. The tunnels should cost "just" $16b. $30b is the current figure for the entire gateway project including the Portal Bridge. If you want to skip the "we have a big problem" part, then go to about here.
10:19 video
Inside America's NEW $30 Billion Tunnel Under the Hudson River

Dec 2025:
1010 WINS posted
Work to begin digging a new Hudson Tunnel is set to begin this spring as two tunnel boring machines custom-built for the project are on their way to New Jersey.

audacy, Photo credit Michael Nagle/Bloomberg
"The tunnel boring machines are coming from a Herrenknecht factory in Germany and are part of the overall $465 million cost to excavate one mile of new rail tunnel in New Jersey. The two machines will work simultaneously to create two parallel tunnel tubes. The boring work in New Jersey will take about a year, according to a GDC spokesperson. The project will then proceed to dig through the Hudson River, which will require different machines designed for that terrain."
The first machine should arrive in January and digging should begin in the Spring.

Jan 2026:
Facebook Reel
[A big Weeks crane helped with the salvage of the Francis Scott Key Bridge. But I have not been able to confirm that this is the same crane.]

June 2026:
Facebook Reel



Friday, December 17, 2021

Lock #1 on Welland Canal in Port Weller in St. Catharines, ON

(Satellite)

This is Lock #1 of the Welland Canal.

Street View, looking downbound

The view above is from the road bridge shown in the raised position in this postcard image.
Old Ontario Series posted
Port Weller, Ontario in 1956.
David Bartczak shared

Amy Daggett posted
FIRST SHIP LOVE
For me, it all started April 10, 2022 when my husband suggested that we go check out the Welland Canal. Now I'm going to admit something, I went begrudgingly. I had seen Mckeil Spirit at Turning Point in Rochester and it was cool but why did I want to spend my day at some canal?
CCGS Griffon downbound out of Lock 1 answered that question and I have been in love with the canal, the ships and the people that make it all work ever since!

Martin Hadamek posted
This photo was taken in 1923. It shows work on the gate recess at Lock 1 on the Welland Ship Canal.
(Credit: St. Catharines Museum & Welland Canals Centre)
Kevin G. Smith: Nice
I see a rail line along the bottom that would have been to remove the concrete rubble.
Marc Rochefort: From the late 70’s through early 90’s we blasted the concrete face off the walls, and replaced with new concrete in pretty much every lock on the canal.
It looked a lot like this but on a larger scale with a lot more equipment.
Lloyd Scott Hardin shared

Janey Anderson posted three photos with the comment:
 Having a drone allows Michel Gosselin to see things we can't always see from the ground - these exceptionally cool ice formation shots are of Lock 1 south gates today.
So I had to look into this a little further to understand it all, of course.
In winter, it’s normal for lock gates on the Welland Canal to leak slightly, especially below Lock 1 where the water is not fully drained. The canal uses miter gates, which are not designed to be watertight. They seal by gravity and water pressure rather than gaskets, so a small amount of seepage is expected and actually helps equalize pressure across the structure.
Cold weather exaggerates this effect. Ice and frazil crystals can prevent the gates from fully sealing, while steel gates and concrete walls contract at different rates, creating tiny gaps. With constant water pressure below the lock, even minor seepage becomes visible as dramatic ice formations when the leaking water freezes. What looks like a problem is largely a combination of design, physics, and winter conditions — controlled leakage helps protect the gates from excessive stress rather than indicating a failure.
I love learning.
#shipjunkies #iceformations #welland #wellandcanal
Feb. 2, 2026
1

2

3

Michael Gallo Street View, Apr 2020
[I included some of the prop wash on the right.]

 æŽŒæŸœåœ¨åŠ , Aug 2020

This appears to be taken from an upbound ship soon after it departed the lock.
Sven Eli Drastrup, Apr 2021

Screenshot @ 2:51
"What Lurks Beneath the Surface: Views of the Empty Welland Canal"

Barbara Benson posted eight photos with the comment: "A series of pictures from my Grandfather's collection. G.J.Shaw when he was over seeing the formation of cribs for the Welland Canal. 1915-1919. Description is on the bottom of each photo. I have also attached a link to a brief bio of my Grandfather. The Dean of Elevator Builders | Search Results | Tay Township Heritage (wordpress.com)"
1

2

3

4

5

6

7

8

3 of 15 photos posted by Karen Limardi with the comment: "The Miena Desgagne upbound below Lock 1 this morning."
a
Brenda Gunn: Fabulous shot! What is she carrying?
Karen Limardi: Brenda Gunn I was thinking windmill base but not quite sure !
Dennis DeBruler: Karen Limardi Indeed. They are probably the segments that are used to build the towers for wind turbines.

b
[I included this one to show how much traffic there is on the Welland Canal. In addition to an articulated tug barge (ATB) moored in the background, another one is downbound. This also shows that ATBs are evidently becoming more common.]

c
[Lock #1 is in the background.]

Wayne Huggins posted via EasyMax Freighter Class, July 16, 2022
1 of 13 photos and videos posted by Michel Gosselin
AML Louis Jolliet is in the Welland canal on October 19, 2022. Destination is Heddle Shipyards. Built in 1938 as a ferry has been converted into a excursion boat. Owned by Croisière AML, Inc of Quebec City.
Michel Gosselin shared

2 of 7 photos posted by Bill Jr Salton with the comment: "AML's 1938-built Louis Jolliet arriving at Heddle Shipyards for a refit yesterday evening."
a

b

I've never seen water spill over a downstream gate like that before on any lock.
Frank McPhee posted
Algoma Harvester in Lock 1, heading north.
 
Spilling water is evidently not a rare occurrence.
Fred Miller II posted
HILDA MARJANNE entering Lock 1, Welland Canal, 1982, on one of her final trips before the conversion.

1 of 3 photos posted by Bill Jr Salton, cropped
Federal Oshima gliding silently toward Lock 1 on her last seaway passage before retirement from FedNav.
[Some comments indicate she was in service 24 years for FedNav and that she was the lead ship in her class.]

Amy Daggett posted
Viking Octantis up in lock 1 in the Welland canal. Look at all those people - 7.21.23

I include this one because one doesn't see the gates partially open very often.
Amy Daggett posted
We made a special trip to the Welland canal this evening to catch Imke (7.27.23). Here she's up on lock 1 getting a quick Seaway inspection. You can see the inspectors to the left.
Patti Kingswood: Thanks for the photos. She is quite unique with only 1/2 her cabin underneath cutaway.

Amy commented on Patti's comment
It is too accommodate her crane.
 
1 of 6 photos posted by Patti Kingswood
Loved watching Frontenac coming out of Lock 1 on Welland Canal.

3 of 6 photos posted by Michel Gosselin, CSL Tadoussac upbound. Note the Heddle Shipyard in the second and third photo.
Michel Gosselin shared
a

b

c

Amy Daggett posted this video, along with several photos, of a downbound freighter with grain. I'm amazed that the water coming out of the lock creates such a turbulent flow. You can get a good look of the downstream part of the Brandon Road Lock. And you have to look rather closely to see if water is coming out of the lock.