30140812 0527c |
0571c |
0566 |
0569 |
Note the triangular spade on the bottom of the anchor. When the LST makes landfall, it waits for high tide and then rams itself onto the beach sand. To get back off, they wait for another high tide, tow this anchor back out to see and then use the winch to pull the boat off the beach. When they were on a trip in Kentucky, they turned to avoid hitting a barge and plowed into a sandbar. Two Coast Guard tugboats could not get it off the sand bar. And then someone remembered that the ship was equipped with this anchor and winch. So they looked in the Yeoman's office and found the instruction book for the winch. It still worked, the Coast Guard towed the anchor away from the ship, and the winch was able to pull the ship off the sand bar. They have since greased the cable to help keep it operational.
Below is a view of the two vertical cylinders from the perspective of the cable.
Note the notches in the middle horizontal shaft. Those notches move the carriage holding the vertical rollers back and forth to guide the cable so that it smoothly winds onto the drum as the drum turns. The following picture is of the backside of the winch. The drum in the foreground would be a brake. At each end of the shaft in the middle would be gears that drive a chain that drives bigger gears on the ends of the drum shaft. What the little hand wheels control is probably why they felt a need to find the instructions.
From behind the winch, I took a picture towards the stern so that you can see the cable going from the winch through a cable guide on the stern. The cable then goes down and holds the anchor we saw above.
Update:
MWRD posted A view from a point north of the construction site for a bridge at Canal Street looking north at a man standing at a hoist used to operate the bridge construction derrick on May 29, 1902. |
Ben Stalvey posted two photos with the comment: "It's Manitowocs Mega Drum for the massive 31000."
2 |
1 |
A spiral grove is evidently machined into the drum to guide the cable. Jason Baker posted three photos with the comment:
I use to get all kinds of very difficult or jobs other people use to turn away on my 1960 King VTL. Here's an example of one of those jobs. These were 66" diameter x 60" tall cable drums with an .875 lead. Now, keep in mind my 1960 King VTL didn't have a half nur not was it designed to thread. The max feed rate of the machine was 1.00 I.P.R. In the 3rd photo you will see an external gear reduction I built to slow down the end out put of the transmission, with machine set at 1.00 lead the external gear reduction would decrease by 12.5% to obtain an .875 lead. This was very tricky, because I had to time the table, tool and starting and end points all exactly to get repetition on the rack and pinion.
1 |
2 |
3 |
I think this is the winch for the hoist for a shaft in an underground mine.
Max Cranes posted MAX Heavy Lift Team provided specialised lifting services to a valued mining client, to unload and rotate a 140.5t Clarke Shaft Winder. Our 500t Terex AC-500-2 and 250t Liebherr LTM1250-6.1 cranes were used to complete the lift. View case study: https://maxcranes.com.au/transport-infrastructure-winder.../ #cranehire #cranes #craneservice #mining #miningequipment #heavylifting #heavyliftteam #remoteworking #terex #liebherr #southaustralia #usg #upperspencergulf Geoffrey Fischer shared |
From a retired Navy CPO [now gone]; the anchor was dropped on the way into shore. With the cargo gone, the hip drew less water and used the anchor to back off. They didn't hang around for the next tide, there was nasty people onshore. with artillery!
ReplyDelete