Sunday, April 5, 2026

1907 Blair Gap Dam on Blair Gap Run and Skewed Arch Bridge over Portage Railroad near Cresson, PA

Dam: (Satellite)
Bridge: (Satellite)
Engine House 6: (Satellite)

Blair Gap Dam


This dam was built in 1907 to provide a water supply, and it is 47' (14.3m) high. [blair-county]

Street View, Nov 2015

Facebook Reel
It is 316' (96.3m) long. Linda called the cylinder to the left of the spillway the valve house.

Skewed Arch Bridge


Street View, Aug 2019

Joanne Harrity, Apr 2021

Jenn Gray, Oct 2023

Kirk (kirkevonphilly), Sep 2025

Troy, May 2018

I was going to skip yet another stone arch until I noticed that the stones change direction about halfway up the arch.
Ken Locher, May 2022

Engine House #6


Sam L, Aug 2024

CJ Q, Oct 2025

Kevin Horst, Oct 2024

Gregory Wood, Mar 2020

Joshua Warzel, Sep 2022

Joshua Warzel, Sep 2022

There is a large visitor center nearby.
lindsta, Sep 2025

No comments:

Post a Comment