Bridge: (Satellite)
Blair Gap Dam
This dam was built in 1907 to provide a water supply, and it is 47' (14.3m) high. [blair-county]
![]() |
| Street View, Nov 2015 |
![]() |
| Facebook Reel It is 316' (96.3m) long. Linda called the cylinder to the left of the spillway the valve house. |
Skewed Arch Bridge
![]() |
| Street View, Aug 2019 |
![]() |
| Joanne Harrity, Apr 2021 |
![]() |
| Troy, May 2018 |
I was going to skip yet another stone arch until I noticed that the stones change direction about halfway up the arch.
![]() |
| Ken Locher, May 2022 |
![]() |
| Facebook Reel |
Information that used to be here about the Allegheny Portage Railroad has been moved to "Allegheny Portage Railroad Engine House #6 for an Incline."







No comments:
Post a Comment