Sunday, October 12, 2014

UP and CP Rail Power on a Mixed Freight

While crossing Forest on the way to the library, I noticed a headlight to the west. Specifically, a freight train was setting in the hole. Since it was still setting there on the way back, we walked down Warren Avenue to the railroad yard to check it out. Each of the three engines was rather rare for the racetrack, so I borrowed my wife's phone to take some pictures in case the train left before I got back. And then I went home and got my camera and some wheels. The train was still there. The sun was on the other side, but I didn't have a choice of going to the other side to take pictures -- the track is lined with private residents on the south side.

20141011 0199



Checking the Diesel Shop, they are:

BNSF 657: Dash 9-44CW, ex-ATSF
UP 9235: C40-8
CP Rail 9575: AC4400CW

Since they normally don't run with a door open, I digitally zoomed in on the engine's guts. The picture to the right is at full camera resolution.


There were covered hopper cars for as far as I could see so I at first assumed it was a unit train. But I could not make sense of who it would run-through with using CP Rail and UP power. Then it occurred to me that I needed to drive down Warren to see if it was a mixed freight train. It was. And as is typical for the racetrack, it was dominated by covered-hopper and tank cars.

I have two theories as to why this train had UP and CP engines. First of all, note that they are old engines. The other railroads are evidently dumping their junk on BNSF to satisfy run-through requirements. So theory one is that the mixed freight was the next freight out of the yard so they used it to get the junk off the system as fast as possible. Theory two is that they did not trust the junk on important unit trains, so they used them on a "move the low priority miscellaneous cars on the weekend" mixed freight. I'm going with the second theory because the Santa Fe is also an old engine.

The first access point was at the head of the old team tracks. The view looking East was decent. But the view looking West had some serious sun issues. I included the uncropped photo to document how badly back lit the angle was.

Looking east towards the engines
Looking west
The TTX gondola car carrying shredded metal is the only type of car other than covered-hoppers and tanks that I could see from this vantage point. The sun was really bothersome, and then I remembered that I have been thinking for the last couple of months of checking out the view of the tracks from Gilbert Park. So I went back to Forest to cross the tracks and then went West on Gilbert Avenue. There was a game in progress, but there was a couple of spots still left in the parking lot. Note the black tank car, Heritage 2 BNSF covered hopper, white tank car sequence above. You can spot that sequence in the following views from the South looking East and then West.


Walking West across Gilbert Park gives the following close up of the west end of the above picture.


I'm not sold on the sunny side. I find the glare to be a bigger problem than using my hand to block out the sun on the dark side. I took some shots from the other side of the baseball diamond. Note the base runner. If a game is not in progress, taking some shots from about first base might be a good vantage point of trains. The automobile traffic wasn't too bad.


Since I saw a gondola car in the westward view above, I pulled into a side street to get a closeup of two coil cars and a bulkhead flatcar.


The next access point was the east side of the Belmont Station. I'm back on the north side of the tracks. This section has a couple of empty lumber cars.



And then east and west views from the west side of the platform. I had forgotten that the tracks curve to the south when looking towards the west.



And this is a relatively short train because we see the end. And the only refer/boxcar that the train had.


Saturday, October 11, 2014

CREATE: GS7 - Belmont Ave under BNSF/CB&Q

(Satellite)

Update: I added some overview pictures at the end and then I added some views from Global Earth.

While taking some pictures of a mixed freight from the Belmont Station platforms, I also took some pictures of the CREATE's $60.3M GS7 underpass project. The referenced write up does not describe the importance of the crossing very well. Downers Grove has 6 crossings -- all were grade crossings. The grade separation at Belmont helps relieve congestion at other crossings also. The write ups are also supposed to indicate if the crossing impacts emergency services. It didn't mention any impacts. But most of the bigger office buildings and hotels are on the north side of town whereas the hook-and-ladder truck is housed south of the tracks. And the hospital is north of the tracks but many of the people live south of the tracks. And some of the school buses for Downers Grove North High School serve houses south of the tracks. At least the kids from Woodridge can no longer use being blocked by a train as an excuse for being late in the morning. (During the rush hour, the gates will sometimes be down for a while because an express will trip the gates before they go up after a local, or vice-versa. BNSF tries not to run freight trains during the rush hours.)

20141011 0298


It is easy to see from the grouping of the girders that the bridge is supporting 3 tracks. The aesthetic touch on the retaining walls are grooves in the concrete. The pattern is more of an artsy statement than a suggestion of stone construction. But I still like it.

The project also included a pedestrian tunnel.

Since pedestrians can now cross the tracks using the underpass, the pedestrian tunnel should have been built at the Main Street station. That is, instead of two non-grade pedestrian crossings at Belmont and none at Main, there should have been one at each. Watching a bunch of people get off an express commuter then have to wait until they can cross the tracks to get to the buses or parking garage is painful. Especially if they not only have to wait for their train to leave, but for some other trains to also come through. A tunnel at Main would also help when you have to buy a ticket in the station for a westbound commuter. When I did it, if there had not been a small window between an eastbound commuter and a freight train, I would have stood on the south side of the tracks watching my commuter train leave the station because it arrived while the freight trains was still passing through.I wonder if I could have gotten a refund if I had been unable to cross the tracks to catch my train.

Update:
20141120 0128
One day I got caught by this stoplight at Haddow and it struck me how you could see the lay of the land from here. So I went back (four times because of sunlight issues) to take overview shots. The natural grade here goes down into the "river valley" of the St. Joe Creek. The water tower in the background is on the other side of the creek valley and is next to 55th Street. Below I digitally zoomed into the underpass and station. Note the stoplights just above the bridges at Curtis street...

...because the view to the right is taken looking south from that intersection so that you can see were the bridge for the St. Joe Creek is with respect to the underpass. It was the proximity of this creek that allows the underpass to be drained. However, we have had a heavy rainfall since the underpass was built, and it demonstrated that when the creek fells up with water, the underpass also fills up with water.

To the left is a view of the creek to the West from the bridge. Note the trees in the upper right hand corner. The view to the right is a closeup of those trees showing how nature can "reclaim" man made structures.
And below shows the new concrete that was part of a rebuilding in 2013. Unfortunately they waited until after the underpass was built to do this construction so that after lanes in Belmont were closed for the underpass construction they again closed lanes for this rebuild.

As I arrived at the Curtis intersection, an eastbound tank car train went through. I caught just the end of the second locomotive, 7829 (ES44DC). The first locomotive was also plain BNSF orange.
Then I took another northward facing photo that includes the station on the left.
And I zoomed in to determine that the tank cars did not have safety shields.

My first trip to Belmont had an intermodal train parked on the tracks. You can see the station between cars on the left and on the right, thanks to an empty car, you can see both the north and south entrance buildings for the pedestrian tunnel.

20141119 0002

For completeness, here is a shot of the east side road ramp. Both of these ramp pictures were taken from the south end of the parking lot off Haddow.


Since I've learned how to use the timeline feature of Global Earth, here is what it looked like in Mar, 2002 before they did the work. And that is how it continued to look through Oct, 2007.
March, 2002
The Aug, 2008 image shows some buildings have been torn down. By Oct, 2009 they had started to build the temporary 2-lane  road around the construction and the new parking lot on the north side.
Oct, 2009
In June, 2010, cars are using the new parking lot. There is an Aug, 2010 image, but it is of poor quality and not much has changed. Unfortunately, the next image is Nov, 2011 and the temporary BNSF tracks have been built and removed. If I remember correctly, the shoefly track was south of the mainline. We do see that the auto traffic is still diverted to the temporary road. They have made good progress building the embankments and excavating the west side of the underpass.
Nov, 2011
By March, 2012, they have moved the traffic from the temporary road to the west lanes of the underpass. They are still working on the east lanes.
March, 2012
By April, 2013, it is done; Belmont is back to being a 4-lane road.
April, 2013

Susan Annella shared
We will never forget this day! [2013]

David Brouwer commented on Susan's share
For My Reference:
Victoria Lee commented on Susan's share
Washington Park doings it's job and keeping most of the surrounding basements dry!!!

CREATE: GS14 - 71st Street

Update: Eddie caught a picture of a crane used during construction. Now that I have seen how slowly the trains run on the IHB, I have a better appreciation for the importance of grade separations with it.

After checking out the I&M Canal Visitor's Center, part of my field trip plan was to use 71st street to get to get over to Harlem Avenue. The underpass on 71st is the $30.6M GS14 project for CREATE, which was completed in November 2013. The tracks are owned by B&OCT (now CSXT) but dispatched by IHB.


20140928 0012


I left the second picture as crooked as proof that my eyes were on the road and not the viewfinder. To take these pictures, I set the camera lens on its widest angle, 18 mm, and then shoot blind. I normally post process a picture to crop down to the part I intended and to straighten the picture.

The decorations on the retaining walls are a nice touch.

I'm still trying to figure out why Chicago builds underpasses instead of overpasses. I now understand why flooding of underpasses is such as big deal when we have heavy rains. And it would take a lot less steel to hold up a road than a railroad.

Update: a zchcsse1 1999 video of trains on the IHB+B&OCT tracks shows what this crossing looked like before the underpass was built. I would estimate the trains are going up to about 30 mph.

Edward Kwiatkowski posted
Construction of the West 71st Street underpass viaduct.
Bridgeview Illinois. September 2012.
Tunneling underneath the Indiana Harbor Belt Railroad.
Back when it was a grade crossing.
Scott Malec posted
Quadruple meet at 71st Street in Bridgeview on 10/7/2006.
Dennis DeBruler If it was that busy, then the grade separation done in 2013 was long overdue.
Scott Malec To be fair, the two trains on the right were not moving. But traffic here could still get intense. I can't believe it's already been 5 years since the grade separation was completed.
Dennis DeBruler I haven't watched the IHB much, but the trains I've seen are moving slowly. At least on the Racetrack, the freights move through pretty quickly. It is the commuters parked at the station that tie up traffic.
Scott Malec posted
Another quagmire on the IHB at 71st Street in Bridgeview on 6/2/2007. All four tracks are occupied. The two northbound trains are either exchanging or getting new crews.
Chuck Mager SNAFU!! Typical IHB train management!! Good for OT, tho.


Monon: New Albany & Salem RR and Monon RR Overview

An early segment of what was to become the Monon RR was the New Albany & Salem built in 1851. As we have seen before, the first town in the name would be the important one to which the other town wants a connection. In this case New Albany was a river town with a thriving ship building business and the largest town in Indiana. Businesses that supported ship building were machine shops, foundries, cabinet and furniture factories, and silversmith shops. (Albany2) The line was extended to Michigan City with the first through train operating July 3, 1854. Part of this extension was taking control on June 17, 1853, of the Crawfordsville & Wabash RR that was chartered Jan 19, 1846.

In 1859 the NA&S reorganized as the Louisville, New Albany & Chicago. As one of the few north-south railroads built in the midwest, it played a big role in the Civil War; and it was one of 20 railroads that pulled Lincoln's funeral train at 5 mph, per orders, from Lafayette to Michigan City. Thus it served 90 miles of the 20-day, 1,666-mile journey. The Indianapolis, Delphi & Chicago organized in June 28, 1865; but the track it built was transferred on March 3, 1881, to Chicago & Indianapolis Air Line, which had been charted on Jan. 29, 1880. On July 1, 1897, the Chicago, Indianapolis & Louisville Railway Company became the owner of the assets of the LNA&C and the C&I Air Line. The CI&L RY had also acquired some branch lines to complete the system map.


History: System Map
The final day of steam operations was June 29,1949. The Monon was one of the first Class I railroads to fully convert to diesels. On January 11, 1956, the CI&L officially changed its name to its longtime nickname -- Monon. The name became history on July 31, 1971, when the railroad merged with the Louisville and Nashville RR. The L&N later went through a series of mergers to become part of todays CSX Transportation.

In addition to running regular passenger service to Dearborn Station in Chicago using the Chicago and Western Indiana Railroad, the Monon ran several specials. The specials included back-to-school trains for the five universities on its line, Old Oaken Bucket game-day trains between Purdue and Indiana University, and trains to the Kentucky Derby. Concerning the five universities:
The Monon served five major Universities in Indiana, Purdue University (West Lafayette), Wabash College (Crawfordsville), DePauw University (Greencastle), Indiana University (Bloomington), and Butler University (Indianapolis). The state's decision to put Purdue University at Lafayette in 1869 had partly to do with Monon service, there since 1852. So important was the college traffic that the road painted its passenger rolling stock the red and gray of Indiana University, and painted its freight engines black and gold of Purdue University. In 1959, after the Indianapolis to Chicago trains were discontinued, it didn't make sense to continue with two color schemes, and to economize, the red and gray passenger scheme was slowly converted to black and gold. (MRHTS)

The northern portion served a typical agriculture market. But the southern portion served the largest limestone deposits in America and extensive coal deposits that are part of the Illinois Basin. New repair shops were opened in Lafayette in 1895 after Lafayette donated $100,000 and 45 acres of land in 1892 to win a competition with Monon, IN, for the new facilities.

INDOT plus Paint

The yellow lines on the right highlight the Monon routes. All of the still active segments (green) are owned by CSX Transportation with the possible exception of the northernmost segment in the Chicago area marked below with a yellow line. INDOT labels that segment as Unknown RR.

INDOT plus Paint
Update: Monon crossed the Pennsy's Panhandle in Munster, IN, at the Airline Junction.

14th picture of 14 Tim Swan pictures shared by Matt Lasayko
[This would be C&WI tracks because the trip from Lafayette has "South Side of Chicago" as the previous picture.]]

Mike Snow posted
Monon No.222 E-1b at Michigan City Indiana September 21, 1941 Swartz-McCarter Collection Photo by: L Kelley
Monon No. 222, Class E-1-B, was built by Brooks in June 1898, #2694, as 202, Class E-1. It was rebuilt as 222, Class E-1-B, in 1925 and retired in 1947.
The Hoosier Line
The Chicago, Indianapolis & Louisville Railway, better known as the "Monon Route," was a local Indiana system serving its home state. According to Mike Schafer's book, "Classic American Railroads, Volume III" it reached a peak size of 573 miles during the early 20th century. What began as the New Albany & Salem was initially conceived only to complement waterborne transportation between the Ohio River and Lake Michigan. This concept ultimately failed as the iron horse proved superior to all other modes of interstate transportation. After operating a linear, north-south route for nearly 30 years a merger during the early 1880's opened new markets to Indianapolis and Chicago. A decade later promoters attempted to access eastern Kentucky's rich coalfields but alas a coup foiled the plan. Had this been accomplished the railroad would likely have carried a far different, and much more profitable, future than the one in which it played the role of inconsequential regional dependent upon interchange traffic. Much of this came from its Louisville & Nashville connection at Louisville, the powerful southern Class I which went on to acquire the Monon in 1971. Today, large sections of the railroad have either been abandoned or sold to short lines. However, some corridors remain in use under successor CSX Transportation.
Branches & Black Diamonds
The Monon was largely a linear network of two main lines; Louisville/New Albany - Michigan City and Indianapolis - Chicago. However, it did operate three notable branches: the first was acquired on March 1, 1886 when the LNA&C picked up the small 17.7-mile Orleans, Paoli & Jasper Railway connecting Orleans with the resorts at French Lick Springs (the OP&J had failed intentions of reaching Evansville, Indiana); the second was a 3-foot narrow-gauge acquired on April 1, 1886 to reach Indiana's coalfields. In another excellent book by Dr. Hilton entitled, "American Narrow Gauge Railroads," it was known as the Bedford & Bloomfield (B&B) with a history dating back to the Bedford, Springville, Owensburg & Bloomfield Railroad organized on November 9, 1874. It was projected to serve limestone quarries and coal mines but its poor physical plant precluded it from being successful at either (the line's one tunnel near Owensburg, a 1,368-foot bore, even contained a waterfall from an underground spring!). The line opened on March 1, 1877 running from Switz City to Bedford. After the LNA&C took control it soon standard-gauged the property and spent a great deal of money attempting to improve operations.
A further issue was B&B's location, based just east of the coalfields which required trackage rights over the Indiana & Illinois to reach mines near Little Giant and Andromeda. Such a setup was not a long-term solution. To correct the problem the LNA&C formed the Indianapolis & Louisville Railroad on March 20, 1899. While it never reached Evansville, as intended, it did complete a 47-mile segment from Wallace Junction to Victoria in October of 1907. This corridor offered a right-of-way capable of handling heavy coal tonnage and enjoyed many years of strong business (about 1 million tons annually) although carried just a fraction of the Appalachian seams. The railroad went on to establish short branches to Gilmore, Cass, and Rainbow along with the previous mines served. With the opening of this line the old B&B was abandoned from Avoca to Switz City in 1935; a further retrenchment occurred in 1943 when the stretch from Avoca to Dark Hollow was also removed. The entire branch was finally pulled up entirely in 1981.
But with new ownership in the form of John Jacob Astor III, financing would not a problem leaving L&N with few options to block the endeavor aside from refusing interchange at Louisville. It all began in 1888 when the Louisville Southern (LS) was leased, which extended away from its home city to Lawrenceburg. From there an LS subsidiary, the Lexington Extension Railroad, provided through service to Lexington. Finally, the Richmond, Nicholasville, Irvine & Beattyville Railroad ("The Riney-B") would complete the corridor east to Beattyville and then south to Cumberland Gap along the borders of Virginia and Tennessee. A great deal of the Riney-B was completed by 1890 having reached Irvine (about 60 miles). Alas, just when it all seemed assured, fate had other plans. Astor passed away unexpectedly on February 22, 1890 and with his death the venture collapsed. Taking contorl was a relatively obscure figure who had no interest in continuing the coalfield project. Dr. William Breyfogle, who owned the largest block of shares at that point, immediately stopped the expansion. He ordered the sale of the everything east of Louisville, replaced top management, and essentially returned the LNA&C to a relatively local carrier dependent upon the L&N for interchange traffic. Astor's death and the Breyfogle incident relegated the modern Monon to a rather insignificant Midwestern regional. In time, the coalfields around Cumberland Gap proved incredibly rich, capable of supporting four railroads (L&N, Norfolk & Western, Southern, and the small [but wealthy] Interstate Railroad) for many, many years. Tonnage was heavy for the L&N it would eventually double-track its main line into the region.
The Modern Monon Railroad
Despite its many mistakes, the Monon was doing relatively well by the late 19th century. One of its few setbacks occurred following the Breyfogle boondoggle (his erratic management eventually led to his ouster) where the Louisville, New Albany & Chicago entered receivership on August 24, 1896. It was then reorganized as the Chicago, Indianapolis & Louisville Railway (CI&L) on March 31, 1897. CI&L's first major step was to improve a severe, 2.27% grade just south of Bloomington. To eliminate this impediment a 9.4-mile bypass was built and completed on June 1, 1899 (the original line ended through service in early 1940 and was abandoned in 1945). Its second notable endeavor was to gain a better entry into Louisville; in 1900 it acquired a one-third control of the Kentucky & Indiana Bridge & Railroad Company (in 1910 its name was changed to the Kentucky & Indiana Terminal Railroad) in partnership with the Southern and Baltimore & Ohio. The massive, double-tracked span not only offered a direct link into the "Gateway To The South" but also offered access to Louisville Union Station.
In 1902 the L&N and Southern acquired majority control of the CI&L, an ownership that would last throughout the company's corporate existence. Ironically, the new owners maintained a relatively hands-off approach since their subsidiary carried few incentives in which to route traffic that direction; its Chicago line, at 325 miles, was longer than any surrounding road's and, as previously discussed, its profile less than ideal. The modern Monon remained relatively unchanged throughout the 20th century relying on interchanging business and what coal traffic it could muster. (Interestingly, despite its Midwestern location, agriculture played only a very minor role. While it handled everything from manufactured goods to limestone, products such as grain and corn were inconsequential.) The Great Depression resulted in another bankruptcy when the CI&L entered receivership again on December 30, 1933. It spent more than a decade mired in reorganization until finally exiting on May 1, 1946 as the Chicago, Indianapolis & Louisville Railway. The new man in charge was John Barriger III who proved a stark contrast to anything the company had previously seen. He believed strongly in a railroad's public image, well-maintained physical plant, and the highest-quality customer service. While somewhat handicapped given the railroad's nature, Barriger's efforts proved successful in returning it to profitability.
He overhauled the company's rolling stock and was so fast in retiring the iron horse that steam-powered service was discontinued just three years after his arrival. The last unit dropped its fire on October 15, 1949. The CI&L was not strong enough to implement many of the grade and track improvements Barriger wanted but he did what he could. (An attempt to bypass all four street-running locations [Bedford, Lafayette, Monticello, and New Albany] was simply too expensive as did a plan to improve grades and curves south of Monon. However, he was able to upgrade the bridge over the Wabash River at Delphi and bypass a swamp-infested region around Cedar Lake.) In an attempt to prop up sagging passenger numbers he introduced new streamliners (utilizing rebuilt heavyweight cars) and unveiled liveries honoring the state's home universities; red, white, and grey (the passenger livery) highlighted Wabash College and Indiana University while black and gold (the freight scheme) featured Purdue University and DePauw University. The passenger angle was Barriger's least successful as business continued to slide, so much so that he cancelled remaining night trains #3 and #4 after September 25, 1949. Perhaps his most ambitious, and certainly most intriguing, plan was to have the Monon merge with the Chicago & Eastern Illinois; Toledo, Peoria & Western; and Minneapolis & St. Louis. As author Don Hofsommer's notes in his book "The Tootin' Louie: A History Of The Minneapolis & St. Louis Railway," the idea was to essentially create a gigantic Elgin, Joliet & Eastern Railway to bypass congested Chicago. Unfortunately, the scheme went nowhere due to stiff opposition (Ben Heineman tried a similar tactic during his stint at M&StL that also failed).
At the end of 1952, Barriger left to become vice president of the New York, New Haven & Hartford bringing an end to the railroad's most colorful and successful era. A few years after his departure, on January 10, 1956, it formally changed its name to the "Monon Railroad." Throughout the 1960s and early 1970s it remained a top-rate company, albeit always a David surrounded by Goliaths. As the merger movement gained momentum officials realized they had to find a partner or be left to wither among the giants. This was a difficult prospect due to the big carriers showing little interest. One last ditch effort to carve out a niche for itself involved running unit coal trains from the Ohio River to Michigan City; it seemed promising but the Interstate Commerce Commission denied the plan. With this defeat the railroad essentially gave up independence and sought inclusion with a large Class I. It managed to work out a deal with the Louisville & Nashville and was acquired by the Dixie Line on July 31, 1971. While the Monon remained relatively obscure for most of its life it is well-remembered and beloved within the communities it served as Indiana's railroad

Traces of Indiana and Midwestern History, Spring 2007, Volume 19, Number 2, p12
[The article summarizes Monon's many corporate names. Monon  Line was officially adopted on Jan 11, 1956.]


Lukas Irons posted the comment:
Word out there in the Hoosier State is that Elkhart and Western has purchased the CSX line between Monticello and Monon. Only about 6 or 7 miles long and part of the mighty Monon which is mostly abandoned south of Monticello, two possible customers are calling to be served in Monticello so far.
Christopher Allen Howe They are also looking at down the road buying the line from Monon to Medaryville to serve the elevator up there eventually.
Dennis DeBruler Those companies would still be dependent on CSX to handle interchange traffic with E&W in Monon in order to get rail service. Given CSX can't seem to handle big customers, what are the odds they can handle some interchange traffic in Monon?

Richard McClelland Simpson III shared a link to his Abandoning The Monon article, which has another map.

Friday, October 10, 2014

Extreme Team Tracks -- Street Running

Update: I suspect the safety of the link, but some Facebook spam was interesting. I summarize with just the examples in USA.

LaGrange, KY: CSXT/L&N

Whittier, AK: tracks and road share the tunnel that provides access to the town

Tampa, FL, apparently running a red light: CSXT/ACL At least these tracks seem to have their own lane down the middle of the road. Studying the Google satellite, my guess is that it is going down 6th Ave.

Redwood City, CA: probably a terminal railroad shared by SP and WP

Lake Charles, LA: a left turn lane shares the tracks. A picture of a head-on chicken game. Downers Grove has a fifth-lane in the middle for left-turns in both directions. The kids called it the suicide lane. Lake Charles seems to have upped the ante for and "exciting" lane. The locomotive had red paint. But I don't know what railroad uses that color. My 1928 Atlas shows SP, Mo Pac, and KCS served that town. So I assume the locomotive is KCS since SP and Mo Pac would be either orange (BNSF) or yellow (UP). Looking at KCS photos, the use red, but not all red. So maybe it is a terminal railroad.



Update: The Canadian Pacific still runs through 11 blocks of 2nd Street in Bellevue, IA. In Warsaw, IN, Norfolk Southern/Big Four uses 2  blocks of Hickory Street between Main and Market Streets.




I have already written about team tracks and their importance in the 1800s when merchants had to transport their supplies using a horse and wagon. While researching the Peru & Indianpolis RR, I came across another example of how important access to the railroad was for the town merchants.
At the request of the Noblesville merchants, the railroad was built in 8th street to reduce the drayage cost for local freight. (ITM)
I had already watched the Indiana Transportation Museum's two videos showing the street running in Noblesville -- looking forward and looking backwards. Note that many of the street crossings don't have any warning devices that a train is coming. Since this line had a lot of freight and passenger traffic before 1918, driving in that town would have been even more exciting than it is now.

I remember when I went to Purdue that the Monon RR (it became part of the Louisville & Nashville in 1971 and thus CSXT) also ran down a street in Lafayette. At the time I wondered why a town would allow a railroad to do such a disruptive routing. I had assumed the railroad wanted to use a street to maintain a gentle grade near the Wabash River. Sources differ as to when the line was relocated -- Wikipedia: 2000, Monon Railroad Historical Technical Society: July 22, 1994. According to the MRHTS source, the reason for street running for the Monon was not reduced grade nor reduced drayage costs but because they were a bully and insisted on using a street through Lafayette. Another MRHTS source explains:
In the early years of railroads in the United States it was common practice to build down the middle of streets. Track in New Albany revealed how old the Monon was.
The New Albany to Michigan City segment of the Monon was built in the early 1850s. Street running is still practiced in New Albany. The segment of the Monon between Bloomington and Bedford is now abandoned. So I have not been able to determine if the street running in Bedford is still used.

I have found so many pictures of the Monon coming down 5th Street in Lafayette, IN that I have made an explicit posting for that town.

There was even some street running in Chicago and quite a few other places.
A video (source) of a long rack train going slowly through LaGrange, KY. It is interesting that Google does not have a street view at First and Main.
A screenshot in case the above video link is not permanent. The main information in the video is that it takes about eight minutes for the train to get through the town. That makes me appreciate that BNSF freights tie up our street crossings for just 2 or 3 minutes.

Tuesday, October 7, 2014

Galena & Chicago Union and Peru & Indianapolis

The first city in a railroad name is considered the more important name. Note that when railroads were first built, the nation was dependent on rivers and canals for transportation so the town on the waterway was considered more important and the railroad was being built to connect the inland town to the waterway. These railroads are an example of connecting towns to waterways.

Galena & Chicago Union RR


The Galena & Chicago Union Railroad was the first railroad built out of Chicago. At the time, the major transportation routes where north and south because of the rivers and canals. And the major cities were river towns such as St. Louis and New Orleans. Galena was another significant town because it was on the river and because it had lead mines. Galena got a post office in 1826. At the time the G&CU was chartered in 1836, Chicago was basically a trading post in a swamp. Since Galena was the more important town, it was the first town in the railroad's name. But that effort to build a railroad failed because of the 1837 panic. So wagons continued to take 11 days to transport lead from Galena to the Chicago River.

Update:
The word “galena” means “lead ore,” and the town is named for the mineral that created the first metal rush in the country. Chicago, at that time, had a population of about 200 people, many of them employed at Fort Dearborn. Even Rockford, with 235 inhabitants, was bigger than Chicago. However, Chicago’s location on the shore of Lake Michigan was a promising one commercially, at a time when waterways were the principal routes of heavy freight. It didn’t take long for the idea of a railroad between Chicago and Galena to take shape. [OldNorthwestTerritory]

In 1847, real estate developers in Chicago obtained the charter and started building the railroad to increase the value of their land that was north of the Chicago river. They could not get financing from East coast investors. They had applied for federal land grants, but were denied even though the Illinois Central got grants. So they sold stock to farmers and built further West as they were able to get more funding. Most people know this route as the C&NW, which is now owned by the Union Pacific.

The G&CU demonstrated service to Oak Ridge (now Oak Park) in 1848 with the Pioneer Locomotive. The railroad progressed to the West -- West Chicago and Elgin in 1850, Belvedere in 1851, Rockford in 1852, and Freeport in 1853. The G&CU never made it to Galena. (UP) Hauling the farmer's wheat harvest proved lucrative enough that they no longer cared about the mining business. (Tribune) And being a link in the anticipated transcontinental traffic became the next priority. Starting in 1854, the G&CU built the more direct Dixon Air Line connecting Chicago to Geneva, Dekalb and Fulton, IL. It opened in 1855 (Metra, cnwhs). "In 1862, the G&CU had leased in perpetuity the Cedar Rapids and Missouri Railroad, which was to be the first railroad to reach Council Bluffs, Iowa, and the First Transcontinental Railroad." (northwest)

"Some towns that were narrowly bypassed by the Galena & Chicago built their own branch lines to connect to that railroad. For instance, a branch was built from Aurora and Batavia to what is now West Chicago. That branch evolved into the BNSF line." (Metra)

During 1855-57, they added a second track between West Chicago and downtown. Since most of the depots had been built on the north side of the original track, the new track had to be built along the south side. You want the depots to serve the inbound passengers to keep them warm while they wait for the train's arrival. And you want them to use the track that is closest to the depot so that they don't have to cross any tracks to get to their cars. So the north track carries eastbound (inbound) traffic and the south track carries westbound (outbound) traffic. This is left-handed running. Railroads normally run right-handed. I have spotted at least one sign that is wrong because the sign-maker was not aware of the exception.

David Daruszka shared with the comment: "Chicago's first railroad."

An 1863 map of the G&CU is interesting because it shows the Chicago & Northwestern RR was another railroad. The merger of the C&NW and G&CU occurred in 1864. "Among the reasons for adopting the C&NW name for the combined company was that it more accurately described the range of the consolidated company – plus the fact that no part of the combined railroad reached Galena." (Metra) The map also indicates that the Chicago, Burlington & Quincy had finished its route from Aurora to Galesburg and the routes to Burlington and Quincy but that it was still using its original line to the C&GU line. Update: an 1862 map.

Brad Burchett posted
Update: Brad's comment:
Chartered in 1836 this line was once the Galena & Chicago Union Railroad. It was Chicago's first rail line. Although it never reached the lead mines of Galena, IL. Freeport, IL was as far west as it went. During the 1970's the C&NW cut the line back to Winnebago, IL and then Rockford.
Seen here in 1991 the local is leaving Rockford heading back to the yard in Belvidere, IL also the site of a Chrysler plant, which has been the main reason the line is still going.
The track branching off to the north is the KD line. At one time it ran to Kenosha, WI. But was cut up in the 1930's. At the time of this photo the line only extened about 5 miles to Loves Park, IL.
John Gebhardt A nice photo to see. Thanks for posting it showing the Rock River bridge behind the train.

This posting reminded me that, while building towards Galena, they realized the real action was going to be in Omaha/Council Bluffs when the transcontinental railroad was finished. So they quit working on this route and built a more direct route to Council Bluffs from West Chicago.

This now branch line is of significance to me because it is the one that goes past the IRM. Of all the visits I have made there, a freight train went past only during my last visit. I took a short video because the motion makes it possible to tell where the train is in the background. And a video gives you a feel for the speed of the train.

Dennis DeBruler shared
The Galena & Chicago Union and the line that curves up to Elgin was completed in Jan 1850. It became part of the C&NW. The route that went south from Turner Junction/West Chicago was the Aurora Branch Railroad, and it became the first 13 miles of the CB&Q. The CB&Q initially grew westward. But then they had to build east to Chicago because C&NW wanted them off of their tracks. They officially opened their own line to Chicago on Dec 26, 1865. The fact that the line was constructed during the Civil War demonstrates the importance of that line. Most railroads were built either in the early 1850s before the economic panics of that decade or after the Civil War.
Dave Prasse That made it as far as my hometown of Freeport , IL .. then “my homeroad” finished the line to Galena and beyond ...
Great history !
http://northwestchicagoland.northwestquarterly.com/...
Dave Prasse https://www.galenahistory.org/.../coming-of-the-railroad/
James Rogers posted
While doing some research of Industrial Illinois,  I found this 1850 map of the area west of Chicago. Note the Plank Roads, and the first railroad west of Chicago. 
In the 1830s there was discussion of linking Galena to Chicago via a railroad.  The area around Galena was rich with Lead Ore, and a railroad was a more efficient way to move the Ore to market.
 The village of Galena in northwest Illinois had a larger population than the one of Chicago at this same time.  Galena was the heart of America's first Mineral Rush. A booming, thriving village with a bright future. Chicago was just a trading post with a population of 200. 
The railroad was to build to Galena and serve the ore Mines in the area. Since Galena was the larger village, it was earned the first name in the first railroad out of Chicago. 
The Galena & Chicago Union Railroad 
The Railroad didn't begin construction until 1848, and during that time the Trading Post of Chicago began to grow. But the plans remained in place to build to Galena. The railroad built to Freeport, Illinois and gained access to Galena via a separate railroad that was building towards Iowa.
By 1855 the Galena had built a line west towards the Mississippi River arriving at Fulton, Illinois across the river from Clinton, Iowa.
.

Peru & Indianapolis RR


When I first saw mention of the P&I in a history of the Lake Erie & Western RR, which was part of the history of the Nickel Plate RR, I was reminded of the convention that the first city in a RR name was considered the more important city and that Peru was on the Wabash & Erie Canal. Then when I was studying a NKP locomotive spotting, I got confirmation that the original purpose of the RR was to connect Indianapolis to the canal.
The Peru & Indianapolis was incorporated January 19, 1846, to connect Indianapolis with the Wabash and Erie Canal at Peru. Construction began at Indianapolis in 1849 and service began over 21.42 miles of line to Noblesville on March 12, 1851. At the request of the Noblesville merchants, the railroad was built in 8th street to reduce the drayage cost for local freight. As the railroad built north it stimulated the location of new towns like Buena Vista, renamed Atlanta in 1881. The Peru & Indianapolis opened to Tipton in 1852, to Kokomo in 1853, and to Peru, 73 miles from Indianapolis, in early 1854. (ITM)
This was the oldest segment of what would become the Nickel Plate System. "In 1864 the P & I was reorganized as the Indianapolis, Peru & Chicago. In 1871 the IP & C took over the 88 mile Chicago, Cincinnati & Louisville, a recently consolidated chain of roads between Peru and Michigan City. The resulting 161 mile line between Indianapolis and Michigan City would be operated as a single operating division for the next 90 years, under a succession of owners." (ITM)

By the time the tracks got to Peru in 1854, railroads were already reducing the importance of canals. That is probably why they developed this map in 1850 to emphasize the railroads that it would connect with.

Library of Congress, 1850 The LoC map is zoomable.
So the line would not have the originally envisioned Indianapolis-to-Peru traffic, but it would still have the business, freight and passenger, of the farmers along its route.
The line enjoyed heavy traffic until 1918. "The gas boom of the 1890s stimulated industrial growth in towns like Noblesville, Arcadia, and Atlanta, with sidings serving glass plants, strawboard factories, tin-plate mills, and other container-related industries." (ITM) And it carried Pennsylvania's Chicago-Indianapolis traffic from Kokomo to Indianapolis. The traffic was so heavy that they installed electric block signals in 1911. I have marked up an INDOT map to show current ownership of the Lake Erie & Western trackage. The Hoosier Heritage Port Authority track is operated by the Indiana Transportation Museum.

Update: A Facebook description of how the P&I was routed through Indianopolis.


Meredosia to the east


I don't know the official name of the railroad because I learned of this route when studying early locomotives. The line was built between Meredosia and Morgan City. Morgan City seems to be one of those 1800s towns that has now disappeared. And the railroad was abandoned so long ago that it does not show up on the 2005 SPV Map as an abandoned railroad. But on Movember 8, 1838, it operated the first locomotive in Illinois --- Rogers. It was shipped from Paterson, New Jersey, via New Orleans.