PortCalls, Photo from Department of Public Works and Highways. "Present connectivity between Ozamis City/Tangub City and Tubod through roll-on/roll-off vessel is about one and a half hour to 2.5 hours including loading and unloading time, while land travel over a distance of 100 km is at 2-2.5 hours....The Panguil Bay Bridge Project has a main bridge (extradosed type) with a length of 320 meters, 1,920 meters approach bridge made of pre-stressed concrete girder, and approach road. The bridge will have a total length of 3.17 km and will surpass the 2.16 km San Juanico Bridge that connects Samar and Leyte provinces in Eastern Visayas Region as the longest bridge in the Philippines." The P7.37b project is expected to be completed in Jun 2024. |
No comments:
Post a Comment