Where the Wabash crosses the river there is an island. So there is a bridge (segment) north of the island and another one south of the island.
In 1988, these steel girder bridges replaced truss bridges.
![]() |
Street View, Northern Segment looking East (Upstream) |
![]() |
Street View, Southern Segment looking West (Downstream) |
Given the new piers, this train was on the southern segment from the IN-25 Bridge looking West.
![]() |
Ben Harleman commented on a post N&W 2156 crossing the Wabash in Logansport, IN! |
Given the road bridge in the background, this must also be the southern segment.
![]() |
MP Rail Photography posted NS 19K crosses the Wabash River in Logansport as it heads westbound on the Lafayette District. September 1, 2024 Logansport, Indiana Power: NS 4135 - AC44C6M |
No comments:
Post a Comment