benesch "The optimum design alternative featured a three-span (517 feet – 821 feet – 517 feet) continuous truss, with the center span designed as a tied arch. The river piers, now supported on open dredged caissons, rest on dense sand over 80 feet below the river bottom." A special computer program was developed to account for earthquake generated forces. |
Katherine Hutto posted Kate Primeaux: Where’d the water go. [Some of the watershed has had a drought during the Summer of 2021.] |
Katherine Hutto commented on her post Second pic....different angle |
"Construction of main span" submitted by Mark Frazier on BridgeHunter |